List of implemented installations IM of metallurgical industry
#Address of implementationType of IM installationsApplication fieldYear of implementation (delivery)
1
Aktobe
Kazakhstan
Aktobe ferroalloy plant - branch of TNC "KAZCHROME"
IM4-1.8-16
4 hoppers of ore. Drying section of raw materials
(МВ04)
2018
IM4-1.8-16
4 hoppers of ore. Drying section of raw materials
(МВ04)
2018
IM3-1.9-4
4 chutes. Drying section of raw materials
(МВ04)
2018
IM3-1.9-8
Coke and anthracite hopper in charging unit of drying furnace №3
(МВ04)
2019
IM3-1.9-8
Coke and anthracite hopper in charging unit of drying furnace №3
(МВ04)
2019
IM4-1.8-16
2 reception hoppers ander vagon-dumper of station of raw materials discharge
(MV01)
2019
IM4-1.8-16
Hoppers of ore and quartzite of charge preparation section and its dosing
(MV06)
2022
2
Alchevs'k
Ukraine
Alchevsk iron and steel works
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2000
IM5-1.8-12
6 hoppers of charge
(Sintering department)
2004
IM5-1.8-6
Loading funnel and hoppers of coneless loading device of blast furnace №1
(Blast-furnace shop)
2007
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2014
3
Halytsynove
Ukraine
Mykolaiv alumina refinery
IM3-0.8-2
2 hoppers
(Coagulation section)
1993
IM5-2.8-9
3 hoppers
(Section of bauxite grinding)
1993
IM5-2.8-9
3 hoppers
(Section of bauxite grinding)
1993
IM5-1.8-24
3 hoppers of bauxite (№4, №5, №7) 1-st and 2-nd tier
(Wet milling section)
2010
IM5-1.8-16
2 hoppers of bauxite
(Wet milling section)
2010
IM5-1.8-14
7 hoppers with boxite
(Wet milling section)
2014
IM5-1.8-16
2 hoppers with boxite
(Wet milling section)
2014
4
Donetsk
Ukraine
Donetsk iron and steel works
IM3-0.8-4
Collecting hopper of a section of dust unloading
("Ladle-furnace" section)
2003
IM3-1.2-6
2 hoppers of a forming mixture
(Mechanized foundry)
2012
IM3-1.2-2
1 hopper of arm forming
(Mechanized foundry)
2012
IM3-1.2-8
8 hoppers of mix-making department
(Mechanized foundry)
2012
IM3-1.2-8
8 hoppers of mix-making department
(Mechanized foundry)
2012
IM3-1.8-2
Reception hopper
(Reserve unit for receiving and loading of bulk materials and ferroalloys)
2013
5
Dunaújváros
Hungary
ISD Dunaferr
IM3-1.9-16
8 hoppers of dust collection
(Electric precipitator)
2015
IM4-1.8-12
Hoppers №7, №8, №9
(Charge preparation shop)
2016
IM4-1.8-12
Hoppers №10, №11, №12
(Charge preparation shop)
2017
6
Yenakijeve
Ukraine
Yenakiieve iron and steel works
IM5-1.8-8
4 top hoppers of charge
(Sintering department)
2002
IM4-1.8-14
6 hoppers of bin trestle
(Blast-furnace shop)
2014
IM4-1.8-14
6 hoppers of bin trestle
(Blast-furnace shop)
2014
7
Zaporizhzhia
Ukraine
Zaporizhstal
IM3-0.8-4
Collecting hopper of a section of dust unloading
(Blast-furnace shop)
2004
IM3-0.8-14
Hoppers of dust collection of electric precipitator
(Sintering department)
2011
IM3-0.8-14
Hoppers of dust collection of electric precipitator
(Sintering department)
2011
IM3-1.8-5
Dust hopper and dust pipe out of electric precipitator of sinter machine №1
(Sintering department)
2012
IM5-1.8-12
3 hoppers under wagon dumper of base coal store of coal injection system BF2-5
(Blast-furnace shop)
2013
IM3-1.5-2
Hopper of dust collection of bin trestle BF-4
(Blast-furnace shop)
2014
IM3-1.5-4
2 hoppers of dust at casting yard BF-4
(Blast-furnace shop)
2014
IM3-1.5-4
2 dust hoppers of aspiration system of casting yard BF-2
(Blast-furnace shop)
2016
IM3-1.5-4
2 dust hoppers of aspiration system of casting yard BF-3
(Blast-furnace shop)
2016
IM3-1.1-10
8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines №№ 1-3
(Sintering department)
2019
IM3-1.1-10
8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines
(Sintering department)
2019
8
Zaporizhzhia
Ukraine
Dneprospetsstal
IM5-0.8-10
10 hoppers
(Dosage section)
2005
9
Zaporizhzhia
Ukraine
Ukrainsky graphit
IM3-0.8-11
11 hoppers of dosage section
(Workshop №2)
2001
IM3-0.8-2
Hopper for dust of furnace №4
(Workshop №2)
2002
IM3-0.8-9
9 hoppers of dosage section
(Workshop №2)
2002
10
Zestafoni
Georgia
Georgian Manganezi
IM3-1.5-20
20 hoppers of bag filters
(Melting shop furnace №4)
2013
IM3-1.5-20
20 hoppers of bag filters
(Melting shop furnace №4)
2014
IM3-1.5-20
20 hoppers of bag filters
(Melting shop furnace №4)
2014
IM3-1.5-20
20 hoppers of bag filters
(Melting shop furnace №4)
2014
11
Kamianske
Ukraine
Dneprovsky Integratediron and steel works
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2003
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2003
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2004
IM5-1.8-12
6 hoppers of sinter machines
(Sintering department)
2004
IM3-0.8-6
3 hoppers of a section of dust unloading of blast furnace №10
(Blast-furnace shop)
2006
IM3-0.8-6
3 hoppers of a section of dust unloading of blast furnace №10
(Blast-furnace shop)
2006
IM5-1.8-6
8 hoppers charge compartment
(Sintering department)
2008
IM5-1.8-12
8 hoppers charge compartment
(Sintering department)
2008
IM4-1.8-16
2 reception coal hoppers under wagon dumper. Coal dust fuel system
(Blast-furnace shop)
2013
12
Kostomuksha
Russia
Karelsky Okatysh
IM4-1.8-16
8 hoppers of iron ore
(Supply section of iron ore of main building of crushing and processing plant)
2013
13
Košice
Slovakia
U.S. Steel Kosice
IM4-1.6-14
Hopper of drum mixer
(Sintering plant)
2008
IM4-1.6-10
Charge hopper of sinter machine
(Sintering plant)
2008
IM4-1.6-10
Dust collecting tower
(Blast-furnace shop)
2008
IM3-1.2-9
9 hoppers of dust collection of electric precipitator
(Sintering plant)
2008
IM3-1.2-9
9 hoppers of dust collection of electric precipitator
(Sintering plant)
2008
IM4-1.6-10
Charge hopper of sinter machine
(Sintering plant)
2011
IM4-1.6-10
Charge hopper of sinter machine
(Sintering plant)
2011
IM4-1.6-14
Hopper of drum mixer
(Sintering plant)
2011
IM4-1.6-10
Charge hopper of sinter machine
(Sintering plant)
2011
14
Kryvyi Rih
Ukraine
ArcelorMittal Kryvyi Rih
IM5-1.8-16
4 refilling chutes of feeders of hammer crusherers
(Sintering department-3)
1997
IM5-0.6-6
6 production hoppers
(Sintering department-2)
1998
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering department-2)
1998
IM5-1.8-12
6 hoppers of sinter machines (top tier)
(Sintering department-1)
2000
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering department-1)
2000
IM3-0.8-6
6 production hoppers
(Sintering department-1)
2000
IM5-1.8-12
6 hoppers of sinter machines (top tier)
(Sintering department-2)
2000
IM5-1.8-12
6 charging chutes of sinter machines
(Sintering department-1)
2003
IM5-1.8-12
6 hoppers of limestone screening section
(Sintering department-3)
2003
IM5-1.8-12
6 charging chutes of sinter machines
(Sintering department-2)
2004
IM2-1.2-3
Bag filter
(Shaped steel casting workshop)
2004
IM2-1.2-3
Bag filter
(Shaped steel casting workshop)
2004
IM2-1.2-6
Bag filter
(Refractory and calciferous workshop)
2004
IM5-1.8-14
2 unloading chutes of conveyers, 6 loading and 6 unloading chutes of drums of secondary mixing.
(Sintering department-1)
2005
IM3-0.8-6
Bag filter
(Refractory and calciferous workshop)
2005
IM3-1.2-4
Collecting hopper of a section of dust unloading of bin trestle DP № 8
(Blast-furnace plant-1)
2007
IM3-1.2-4
Collecting hopper of a section of dust unloading of casting yard DP № 8
(Blast-furnace plant-1)
2007
IM5-1.8-16
2 hoppers of ore of dosage section
(Sintering department-3)
2007
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering department-2)
2009
IM5-1.8-16
2 hoppers of ore of dosage section
(Sintering department-3)
2009
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering department-1)
2012
IM3-1.8-4
Hopper of dust collection of aspiration system of casting yard and bin trestle BF-6
(Blast-furnace plant-1)
2013
IM5-1.8-12
6 hoppers of sinter machines (top tier)
(Sintering department-2)
2014
IM3-2.3-16
2 hoppers with limestone of charge hoppers block
(Sintering department-3)
2014
IM3-1.1-16
Dust hoppers of electric precipitator of sinter machine №6
(Sintering department-2)
2016
IM3-1.1-16
Dust hoppers of bag filter of sinter machine №5
(Sintering department-2)
2017
IM3-1.1-16
Dust hoppers of precipitator of sintering machine №4
(Sintering department-2)
2019
IM4-1.8-24
6 hoppers of sintering machines (top and bottom tiers)
(Sintering department-2)
2020
IM3-1.2-4
Collecting hopper of a section of dust unloading of bin trestle DP № 8
(Blast-furnace plant-1)
2021
15
Mariupol'
Ukraine
Ilyich iron and steel works
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering plant)
1994
IM5-1.8-12
6 hoppers of sinter machines (bottom tier)
(Sintering plant)
1994
IM5-0.8-4
4 hoppers of a shaping section
(Shaped steel casting workshop)
1995
IM5-0.8-4
4 hoppers of a shaping section
(Shaped steel casting workshop)
1995
IM5-0.8-2
2 hoppers of a sand filling section
(Shaped steel casting workshop)
1995
IM5-1.8-12
6 hoppers of sinter machines (top tier)
(Sintering plant)
1996
IM5-1.8-12
6 hoppers of sinter machines (top tier)
(Sintering plant)
1996
IM3-0.8-14
14 hoppers of a section of cleaning of spill
(Shaped steel casting workshop)
1996
IM5-0.4-2
2 hoppers of a knockout section
(Shaped steel casting workshop)
1996
IM5-0.6-2
2 hoppers of a section of mixture preparation
(Shaped steel casting workshop)
1996
16
Mariupol'
Ukraine
Azovstal Iron and Steel Works
IM5-1.8-14
7 collecting hoppers
(Sintering plant)
1992
IM3-0.8-4
4 hoppers of a forming mixture
(Mechanized foundry)
1994
IM3-0.8-9
9 hoppers of a sand conditioning unit
(Mechanized foundry)
1994
IM5-1.8-10
5 charge hoppers (bottom tier)
(Sintering plant)
1994
IM5-1.8-10
5 charge hoppers (bottom tier)
(Sintering plant)
1994
IM5-1.8-8
2 hoppers of 31-nd mark
(Sintering plant)
1994
IM3-0.8-2
Charging unit of a drum-mixer
(Sintering plant)
1995
IM5-0.4-1
Reloading unit of the conveyor
(Sintering plant)
1995
IM5-0.4-1
1 hopper of a section of stuffing flasks
(Mechanized foundry)
1995
IM3-0.8-4
Charging unit of drum-pelletizers
(Sintering plant)
1995
IM5-1.8-10
5 charge hoppers ( top tier)
(Sintering plant)
1995
IM5-1.8-10
5 charge hoppers ( top tier)
(Sintering plant)
1995
IM3-1.0-2
2 production hoppers
(Sintering plant)
1997
IM3-1.0-2
2 production hoppers
(Sintering plant)
1997
IM5-1.8-2
2 hoppers of CLD BF №3
(Blast-furnace plant)
1997
IM5-1.8-2
2 hoppers of CLD BF №4
(Blast-furnace plant)
1999
IM5-0.8-5
4 hoppers of gathering of dust BF №6
(Blast-furnace plant)
2003
IM5-1.8-14
7 collecting hoppers
(Sintering plant)
2003
IM5-1.8-10
5 charge hoppers (bottom tier)
(Sintering plant)
2003
IM5-1.8-10
5 charge hoppers (bottom tier)
(Sintering plant)
2003
IM5-1.8-8
2 hoppers of 31-nd mark
(Sintering plant)
2003
IM5-1.8-10
5 charge hoppers ( top tier)
(Sintering plant)
2003
IM5-1.8-10
5 charge hoppers ( top tier)
(Sintering plant)
2003
IM5-1.8-8
4 reception hoppers
(Sintering plant)
2003
IM3-0.8-6
Coke screens BF №2
(Blast-furnace plant)
2005
IM3-0.8-6
Coke screens BF №3
(Blast-furnace plant)
2005
IM3-0.8-6
Coke screens BF №4
(Blast-furnace plant)
2005
IM3-0.8-6
Coke screens BF №5
(Blast-furnace plant)
2005
IM3-0.8-6
Coke screens BF №6
(Blast-furnace plant)
2005
IM3-0.8-2
Charging unit of a drum-mixer
(Sintering plant)
2008
IM3-1.8-8
4 silos of coal preparation shop
(Coke and chemical production)
2008
IM3-0.8-4
Charging unit of drum-pelletizers
(Sintering plant)
2008
17
Mednogorsk
Russia
Mednogorsk copper-sulphur combine (MCSC)
IM3-0.8-16
Dust collection hoppers
(Aerodynamic losses furnace (ALF))
2010
IM3-0.8-12
Dust collection hoppers
(Converters №2,3)
2010
IM3-1.2-8
Blocks of thermosyphons
(Aerodynamic losses furnace (ALF))
2010
IM3-1.2-8
Thermosiphons block
(Converters №2,3)
2010
18
Novokuznetsk
Russia
EVRAZ ZSMK
IM3-1.9-16
8 silos of closed coal storage
(Coal preparation workshop of coke and by-product process)
2015
IM3-1.9-16
8 silos of indoor coal storage
(Coal preparation workshop of coke and by-product process)
2015
IM3-1.9-6
3 hoppers and pipe with ferro-alloys.
(Electric steel melting workshop)
2016
19
Ostrava
Czechia
ArcelorMittal Ostrava a.s.
IM4-1.8-12
Dust collecting tower
(Blast-furnace shop)
2013
20
Revda
Russia
Sredneuralsky copper-smelting plant (SCSP)
IM3-2.4-2
Thermo-siphons of heat-recovery boiler
(Copper-smelting plant)
2012
21
Ridder
Kazakhstan
Ridder integrated iron and steel works
IM4-1.8-18
3 furnace hoppers with charge
(Waelz-shop)
2015
IM3-1.1-5
5 transfer chutes
(Waelz-shop)
2015
22
Sorsk
Russia
Sorsk ferromolybdenum plant
IM3-1.9-18
9 chutes of cross conveyors within crushing department
(Concentration plant)
2013
23
Temirtau
Kazakhstan
ArcelorMittal Temirtau
IM3-1.9-16
4 silos (№№25-28) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant)
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№22-24) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant)
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№1-4) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant)
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№9-12) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant)
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№5-8) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant)
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№17-20) of closed coal storage-1 of coal beneficiation plant-2
(Сoke and by-product process)
2016
IM3-1.9-16
4 silos (№№13-16) of CCS-1 (closed coal storage), CPS (coal preparation shop), CBP (coal benefitiation plant-2)
(Сoke and by-product process)
2016
IM3-2.3-20
10 silos with concentrate of measuring section
(Сoke and by-product process)
2017
IM3-2.3-20
10 silos with concentrate of measuring section
(Сoke and by-product process)
2017
IM4-1.8-12
3 hoppers under car dumper №3
(Сoke and by-product process)
2017
IM4-1.8-8
4 hoppers under car dumpers №1 and №2
(Сoke and by-product process)
2017
IM4-1.8-16
4 hoppers of sinter machine №6
(Sinter production)
2017
IM4-1.8-16
7 hoppers (№№201-206,208) of charge chain of sinter machine №5 of charge section
(Sinter production)
2018
IM4-1.8-16
7 hoppers (№№207,209-214) of charge chain of sinter machine №5 of charge department
(Sinter production)
2018
IM4-1.8-16
7 hoppers (№№215-221) of charge chain of sinter machine №5 of charge department.
(Sinter production)
2018
IM4-1.8-16
4 hoppers of sinter machine №5
(Sinter production)
2018
IM4-1.8-16
4 hoppers of sinter machine №7
(Sinter production)
2018
IM4-1.8-16
7 hoppers of charge chain of sinter machine №6 of charge section
(Sinter production)
2019
IM4-1.8-16
7 hoppers of charge chain of sinter machine №6 of charge section
(Sinter production)
2019
IM4-1.8-16
7 hoppers of charge chain of sinter machine №6 of charge section
(Sinter production)
2019
IM4-1.8-16
7 hoppers of charge chain of sinter machine №7 of charge section
(Sinter production)
2019
IM4-1.8-16
7 hoppers of charge chain of sinter machine №7 of charge section
(Sinter production)
2019
IM4-1.8-16
7 hoppers of charge chain of sinter machine №7 of charge section
(Sinter production)
2019
24
Tula
Russia
Kosaya Gora iron works
IM5-1.8-12
Hopper with dolomite and limestone of bin trestle of blasting furnace №1
(Blast-furnace shop)
2010
IM4-1.8-20
The hopper with dolomite and limestone of bin trestle of blasting furnace № 1
(Blast-furnace shop)
2011
25
Ust'-Kamenogorsk
Kazakhstan
Ust-Kamenogorsk metallurgical complex
IM4-1.8-8
Hoppers of charge
(Charge curing workshop of lead plant)
2009
IM4-1.8-8
Hoppers of charge
(Charge curing workshop of lead plant)
2009
26
Cherepovets
Russia
Cherepovets iron and steel works
IM3-0.8-5
5 hoppers of dust collection of electric precipitator
(Thermal heat and power station)
2010
IM3-0.8-5
5 hoppers of dust collection of precipitator
(Thermal heat and power station)
2010
IM3-0.8-5
5 hoppers of dust collection of electric precipitator
(Thermal heat and power station)
2010
IM3-0.8-5
5 hoppers of dust collection of electric precipitator
(Thermal heat and power station)
2010
IM3-1.2-4
Hopper with dust of fired dolomite
2012
IM3-1.5-4
Hopper with dust of sintering production
(Aspiration installation Д-7а)
2013
IM3-1.5-4
Hopper with dust of sintering production
(Aspiration installation Д-7а)
2013
IM3-1.5-4
Hopper with dust of sintering production
(Aspiration installation Д-7а)
2013
IM3-1.5-4
Hopper with dust of sintering production
(Aspiration installation Д-7а)
2013