List of implemented installations IM of chemical industry
# | Address of implementation | Type of IM installations | Application field | Year of implementation (delivery) | |
---|---|---|---|---|---|
1 | Balakovo Russia Balakovo branch of JSC "Apatit" | IM3-1.2-10 | Hoppers and chutes (Production section of mineral fertilizers) | 2008 | |
IM3-1.5-10 | Hopper with phosphogypsum hemihydrate | 2013 | |||
IM4-1.8-8 | Hopper with lump lime (Section of lime reception and preparation of lime milk in ЦНОСВиВ) | 2016 | |||
2 | Belorechensk Russia EuroChem Belorechensk Mineral Fertilizers | IM3-1.9-6 | Reception discharge hopper of apatite concentrate store №2 (Workshop of extraction phosphoric acid production) | 2015 | |
3 | Volkhov Russia Volkhov branch of JSC "Apatit" | IM3-1.2-8 | 8 dust collection hoppers (Electric precipitator) | 2011 | |
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-4 | 2 hoppers of finished product (Finished products storage) | 2012 | |||
IM3-1.5-17 | 3 hoppers and cyclone (Operational section) | 2013 | |||
IM3-1.9-4 | Hopper with soda (Cascade reactor assembly for 1st stage of neutralization) | 2014 | |||
IM3-1.5-10 | Cyclone СДК-ЦН-33, absorber Venturi, chute moving from elevator to screen, chute moving from screw to dust hopper, chute moving from dust hopper to air screw feeder (mineral fertilizers production) | 2014 | |||
IM3-1.9-4 | Hopper of apatite concentrate pos.E5 (Production of extraction phosphoric acid) | 2016 | |||
IM3-1.5-8 | Two hoppers of soda (pos. 33 and pos.34) (Unit of 2-nd stage neutralization of polyphosphates production) | 2016 | |||
IM3-1.5-17 | Chute and 2 pipes (Production unit of double superphosphate of mineral fertilizers production) | 2017 | |||
IM3-1.5-3 | Interspersing chutes of mixing cylinder (mineral fertilizers production) | 2019 | |||
IM3-1.1-7 | Chutes T-3/1, T-3/2, T-4 (2 pcs.) of unloading unit of apatite concentrate (Production of extraction phosphoric acid) | 2021 | |||
4 | Gomel Belarus Gomel chemical plant | IM3-1.5-18 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2012 | |
IM3-1.5-20 | Chutes, hoppers, cyclones (Workshop of hard-blending mineral fertilizers) | 2013 | |||
IM3-1.5-15 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2013 | |||
IM3-1.5-12 | 3 hoppers of phosphogypsum (pos.53,57,353) (Workshop of phosphoric acid) | 2016 | |||
5 | Zaporizhzhia Ukraine Zaporozhye abrasive combine | IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |
IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |||
6 | Kingisepp Russia PG "Phosphorite" | IM3-1.2-8 | Unloading hopper with phosphohemihydrate | 2011 | |
IM3-1.2-8 | Unloading hopper of rotary vacuum filter | 2013 | |||
IM3-1.5-6 | Hopper of phospho-hemihydrate pos.1163 (Workshop of extraction phosphoric acid) | 2015 | |||
IM3-1.5-10 | Hopper of phospho-hemihydrate БТ-3 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 1163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 4163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hoppers of phosphate raw materials pos. 1114/1,2, pos. 3114/1,2 (Workshop of extraction phosphoric acid) | 2017 | |||
7 | Kirovsk Russia Apatite-nepheline beneficiation plant-3, Kirov branch of JSC "Apatit" | IM3-1.9-8 | 1 hopper with 4 outlets (Loading unit of apatite/nepheline concentrate) | 2016 | |
8 | Kirovsk Russia Oleniy Ruchey | IM4-1.8-6 | Hopper (Coarse crushing section) | 2013 | |
IM4-1.8-6 | Hopper (Medium and fine crushing section) | 2013 | |||
9 | Lyuban Belarus Nezhin mining and processing plant | IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |
IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |||
10 | Makiivka Ukraine Uniplast | IM1-0.8-5 | 5 production hoppers | 2007 | |
11 | Mariupol' Ukraine Azovstal Iron and Steel Works | IM3-0.8-4 | Charging unit of drum-pelletizers (Sintering plant) | 2008 | |
12 | Novoamvrosiivs'ke Ukraine Amvrosiyevka branch PC "HeidelbergCement Ukraine" | IM3-1.2-6 | Dust collection hoppers of electric precipitator (Cement production) | 2008 | |
13 | Nokia Finland Nokian Tyres plc | IM3-1.1-6 | 1 silos with ZnO (Rubber mixing workshop) | 2016 | |
IM3-1.5-3 | 3 silos with ZnO (Rubber mixing workshop) | 2018 | |||
14 | Odesa Ukraine Lukoil Odessa oil refinery | IM2-1.2-4 | Furnace hoppers with chalk and 2 chutes | 2010 | |
15 | Salavat Russia Gazprom neftexim Salavat | IM3-1.2-8 | Fluidized bed installation | 2011 | |
16 | Saint Petersburg Russia ULTRA Fert | IM3-1.9-2 | 2 silos of complex mineral fertilizers (BN220 - tank for solidification and BN145 - buffer tank for surpluses) (Ammonium sulphate compaction) | 2017 | |
17 | Salihorsk Belarus Belaruskali | IM5-1.8-16 | Reception surtaface ore hopper of pit head building 2 SDF (sylvinite dressing factory) (1 mining department) | 2010 | |
IM3-1.8-2 | Hopper of sylvinite ore 12 cubic meters of trans-shipping unit №2 of conveyor surface complex SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hoppers of sylvinite ore 450 cubic meters, crushing shop of Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hopper of sylvinite ore 450 cubic meters, crushing shop of surface complex, Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Hopper of pit head building 550 cubic meters of Berezovsky mine, SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5 of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5a of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Reception hopper of technical salt on railway track №6 of loading section, SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6а of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6b of loading department SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-16 | Hopper of finished product (3-rd railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
IM3-2.3-16 | Hopper of finished product (4-th railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
18 | Temirtau Kazakhstan ArcelorMittal Temirtau | IM3-1.9-16 | 4 silos (№№25-28) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |
IM3-1.9-16 | 4 silos (№№22-24) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№1-4) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№9-12) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№5-8) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№17-20) of closed coal storage-1 of coal beneficiation plant-2 (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№13-16) of CCS-1 (closed coal storage), CPS (coal preparation shop), CBP (coal benefitiation plant-2) (Сoke and by-product process) | 2016 | |||
19 | Cherepovets Russia Apatit | IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №1) | 2006 | |
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №2) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №3) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №4) | 2008 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.2-6 | 2 hoppers for off-grade product (Section №1) | 2010 | |||
IM3-1.8-4 | 2 hoppers with potassium chloride (Section №2) | 2010 | |||
IM3-1.5-5 | 2 hoppers (0,6m3 и 2,4m3) of aluminium fluoride trihydrate (Aluminum fluoride workshop) | 2013 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.70 (Workshop of mineral fertilizers production) | 2013 | |||
IM1-2.4-1 | Chute of drying and calcination unit (Aluminum fluoride workshop) | 2015 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.67 (Workshop of mineral fertilizers production) | 2016 | |||
IM3-1.9-8 | 2 hoppers with apatite concentrate, section №1, b.2.12, 2.15 (Workshop of extraction phosphoric acid -1) | 2017 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.5-6 | 4 hoppers of finished products of unloading unit (Mineral fertilizers warehouse) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.5-4 | 2 fertilzer hoppers of housing 2.67 (Workshop of mineral fertilizers production) | 2021 |