# | Address of implementation | Type of IM installations | Application field | Year of implementation (delivery) | |
---|---|---|---|---|---|
1 | Aktobe Kazakhstan Aktobe ferroalloy plant - branch of TNC "KAZCHROME" | IM4-1.8-16 | 4 hoppers of ore. Drying section of raw materials (МВ04) | 2018 | |
IM4-1.8-16 | 4 hoppers of ore. Drying section of raw materials (МВ04) | 2018 | |||
IM3-1.9-4 | 4 chutes. Drying section of raw materials (МВ04) | 2018 | |||
IM3-1.9-8 | Coke and anthracite hopper in charging unit of drying furnace №3 (МВ04) | 2019 | |||
IM3-1.9-8 | Coke and anthracite hopper in charging unit of drying furnace №3 (МВ04) | 2019 | |||
IM4-1.8-16 | 2 reception hoppers ander vagon-dumper of station of raw materials discharge (MV01) | 2019 | |||
IM4-1.8-16 | Hoppers of ore and quartzite of charge preparation section and its dosing (MV06) | 2022 | |||
2 | Alchevs'k Ukraine Alchevsk iron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2000 | |
IM5-1.8-12 | 6 hoppers of charge (Sintering department) | 2004 | |||
IM5-1.8-6 | Loading funnel and hoppers of coneless loading device of blast furnace №1 (Blast-furnace shop) | 2007 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2014 | |||
3 | Anadyr Russia Valunisty mine | IM4-1.8-20 | 4 receptive hoppers with mining mass | 2018 | |
IM4-1.8-8 | Receptive hopper | 2021 | |||
4 | Angarsk Russia Combined heat and power (CHP-10) branch PJSC "Irkutskenergo" | IM4-1.8-12 | 2 reception hoppers of coal ander vagon-dumper №1 (fuel supply workshop) | 2018 | |
IM4-1.8-12 | Two receptive hoppers of coal under wagon dumper (Fuel supply workshop) | 2021 | |||
5 | Andrushivka Ukraine Andrushivskyi dairy plant | IM1-2.4-7 | Drying tower and 3 cyclones (Production unit of dried dairy products) | 2014 | |
6 | Arsk Russia Arsk milk combine | IM3-0.8-12 | Installation for manufacture of dry milk | 2011 | |
7 | Arkhangelsk Russia PE Arkhangelskkhleb | IM3-0.8-10 | 8 hoppers (Free-packing store of flour) | 2007 | |
8 | Okhtyrka Ukraine Akhtyrka cheese combine | IM2-1.2-7 | Installation for manufacture of dry milk | 2007 | |
9 | Balakovo Russia Balakovo branch of JSC "Apatit" | IM3-1.2-10 | Hoppers and chutes (Production section of mineral fertilizers) | 2008 | |
IM3-1.5-10 | Hopper with phosphogypsum hemihydrate | 2013 | |||
IM4-1.8-8 | Hopper with lump lime (Section of lime reception and preparation of lime milk in ЦНОСВиВ) | 2016 | |||
10 | Baltasi Russia Baltasi dairy combine | IM1-1.2-11 | Drying tower and cyclones (Spray drying installation) | 2004 | |
11 | Bila Tserkva Ukraine Bila Tserkva bread-baking combine | IM3-0.8-12 | 12 hoppers (Free-packing store of flour) | 2002 | |
IM1-1.2-7 | 7 production hoppers | 2005 | |||
IM1-1.2-12 | 12 production hoppers | 2005 | |||
12 | Bilyne Ukraine Balta milk canning plant of baby products | IM1-1.2-15 | Drying tower and cyclones (Spray drying installation) | 2006 | |
IM1-1.2-15 | Drying tower and cyclones (Spray drying installation) | 2009 | |||
13 | Bilyts'ke Ukraine DTEK Oktyabrskaya CPP | IM3-2.4-8 | 2 reception hoppers with coal (Wagon dumping section) | 2012 | |
14 | Belorechensk Russia EuroChem Belorechensk Mineral Fertilizers | IM3-1.9-6 | Reception discharge hopper of apatite concentrate store №2 (Workshop of extraction phosphoric acid production) | 2015 | |
15 | Biaroza Belarus Beryozovka butter-cheese combine | IM2-1.2-9 | Installation for manufacture of dry milk | 2008 | |
16 | Bilasuvar Azerbaijan Bilyasuvar Agro | IM1-1.2-11 | Drying tower and cyclones (Spray drying installation) | 2007 | |
17 | Bobrovytsya Ukraine Bobrovytsia branch of Buryn dairy factory | IM2-1.2-11 | 4 cyclones and 1 drying tower (Production unit of dried skimmed milk) | 2005 | |
18 | Barysaw Belarus Borisovkhlebprom | IM3-0.8-12 | 12 hoppers (Free-packing store of flour) | 2007 | |
19 | Boryspil' Ukraine Borispolsky experimental mixed fodder factory | IM3-0.8-11 | 11 hoppers (The main dosing unit of components) | 2006 | |
20 | Buryn' Ukraine Burynsky dairy factory | IM1-2.4-10 | Drying tower and cyclones (Milk drying installation) | 2016 | |
21 | Vanino Russia Daltransugol | IM4-1.8-16 | Receptive hoppers №3 and №4 of wagon dumper | 2017 | |
IM3-1.9-10 | Overload units from conveyors К 1А and К 1В to conveyors К 1.1А and К 1.1В (TCS tower) | 2018 | |||
IM3-1.9-13 | Overload units from К 1.1А and К 1.1В to conveyors К 3А, К 2А and K 2B (T1 tower) | 2018 | |||
IM3-1.9-15 | Overload units from conveyers К 3А, К 4А and К 4В to conveyors К 5А and К 5В (T6 tower) | 2018 | |||
IM3-1.9-6 | Overload units from conveyers К 5А and К 5В to conveyers К 6А and К 6В (T7 tower) | 2018 | |||
IM4-1.8-16 | Receptive hopper of wagon dumper | 2019 | |||
IM4-1.8-16 | Two feed hoppers under wagon dumper of 3rd line. | 2020 | |||
22 | Vatutine Ukraine Combine of bagel products | IM3-0.8-7 | 6 silos and flour transport units (Free-packing store of flour) | 2016 | |
IM1-1.2-6 | 6 production hoppers of flour | 2016 | |||
23 | Velykyi Burluk Ukraine Velykyi Burluk cheese-making plant | IM1-2.4-6 | Drying installation | 2019 | |
24 | Vyzyrka Ukraine TIS-Coal | IM3-1.5-16 | 6 hoppers of coal (Bulk terminal №3) | 2015 | |
IM3-1.5-8 | Sloping wall above spill baler (Wagon dumper №2) | 2020 | |||
25 | Volkhov Russia Volkhov branch of JSC "Apatit" | IM3-1.2-8 | 8 dust collection hoppers (Electric precipitator) | 2011 | |
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-4 | 2 hoppers of finished product (Finished products storage) | 2012 | |||
IM3-1.5-17 | 3 hoppers and cyclone (Operational section) | 2013 | |||
IM3-1.9-4 | Hopper with soda (Cascade reactor assembly for 1st stage of neutralization) | 2014 | |||
IM3-1.5-10 | Cyclone СДК-ЦН-33, absorber Venturi, chute moving from elevator to screen, chute moving from screw to dust hopper, chute moving from dust hopper to air screw feeder (mineral fertilizers production) | 2014 | |||
IM3-1.9-4 | Hopper of apatite concentrate pos.E5 (Production of extraction phosphoric acid) | 2016 | |||
IM3-1.5-8 | Two hoppers of soda (pos. 33 and pos.34) (Unit of 2-nd stage neutralization of polyphosphates production) | 2016 | |||
IM3-1.5-17 | Chute and 2 pipes (Production unit of double superphosphate of mineral fertilizers production) | 2017 | |||
IM3-1.5-3 | Interspersing chutes of mixing cylinder (mineral fertilizers production) | 2019 | |||
IM3-1.1-7 | Chutes T-3/1, T-3/2, T-4 (2 pcs.) of unloading unit of apatite concentrate (Production of extraction phosphoric acid) | 2021 | |||
26 | Vil'nians'k Ukraine Agroproinvest 08 | IM3-1.2-16 | 6 hoppers with husk and press cake | 2010 | |
IM3-1.2-16 | 6 hoppers with husk and press cake | 2010 | |||
IM3-1.2-16 | 6 hoppers with husk and press cake | 2010 | |||
27 | Vorkuta Russia Vorkutinskaya Mine | IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2006 | |
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
28 | Vorkuta Russia Severnaya Mine | IM5-1.8-10 | 4 chutes of accumulative hopper with coal | 2008 | |
IM5-1.8-8 | 5 chutes of accumulative hopper with coal | 2008 | |||
29 | Vyazma Russia Vyazmamolrus | IM2-1.2-8 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2009 | |
30 | Hadyach Ukraine Gadyachsyr | IM1-1.2-9 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2003 | |
IM2-1.2-6 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2003 | |||
31 | Halytsynove Ukraine Mykolaiv alumina refinery | IM3-0.8-2 | 2 hoppers (Coagulation section) | 1993 | |
IM5-2.8-9 | 3 hoppers (Section of bauxite grinding) | 1993 | |||
IM5-2.8-9 | 3 hoppers (Section of bauxite grinding) | 1993 | |||
IM5-1.8-24 | 3 hoppers of bauxite (№4, №5, №7) 1-st and 2-nd tier (Wet milling section) | 2010 | |||
IM5-1.8-16 | 2 hoppers of bauxite (Wet milling section) | 2010 | |||
IM5-1.8-14 | 7 hoppers with boxite (Wet milling section) | 2014 | |||
IM5-1.8-16 | 2 hoppers with boxite (Wet milling section) | 2014 | |||
32 | Gomel Belarus Gomel chemical plant | IM3-1.5-18 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2012 | |
IM3-1.5-20 | Chutes, hoppers, cyclones (Workshop of hard-blending mineral fertilizers) | 2013 | |||
IM3-1.5-15 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2013 | |||
IM3-1.5-12 | 3 hoppers of phosphogypsum (pos.53,57,353) (Workshop of phosphoric acid) | 2016 | |||
33 | Horishni Plavni Ukraine Poltava ore mining and processing enterprise | IM3-1.5-5 | Dash plates of disintegrators of processing line №2 PF-1 (Pelletizing factory) | 2017 | |
IM3-1.5-5 | Dash plates of disintegrators of processing line №3 PF-2 (Pelletizing factory) | 2019 | |||
IM3-1.5-5 | Dash plates of disintegrators of processing line №1 PF-1 (Pelletizing factory) | 2019 | |||
IM3-1.5-5 | Dash plates of disintegrators of processing line №4 PF-2 (Pelletizing factory) | 2019 | |||
IM3-1.9-6 | 3 hoppers of shipping unit into carriages F&SC (Сrushing and processing plant) | 2019 | |||
IM3-1.9-8 | Receptive hopper of limestone (№3) of conveyer KD-1 of charge unit of pellet production workshop of gallery №2 (Pelletizing factory) | 2019 | |||
IM3-1.5-7 | Three reloading conveyor chutes: from K1 to K2 + autostella, from K2 to K3, from K3 to K6 F&CS (Сrushing and processing plant) | 2020 | |||
IM3-1.5-2 | Reloading chute from conveyer K4 to К11126 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-2 | Reloading conveyor chute from K3 to K4 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-6 | Three reloading chutes of conveyers: from K6 to K7, from K7 to K8, from K8 to K9 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.9-12 | Six reception hoppers along conveyor K6 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-6 | 3 transhipment chutes from batchers №1,2,3 to conveyer K-1 F&SC (Сrushing and processing plant) | 2021 | |||
IM3-1.9-12 | 4 discharge chutes of hopper Б1 PF-2 (Pelletizing factory) | 2021 | |||
34 | Horlivka Ukraine Konti | IM1-1.2-6 | Production hoppers | 2007 | |
IM3-0.8-4 | Hoppers (Free-packing store of flour) | 2008 | |||
35 | Horodenka Ukraine Horodenka cheese factory | IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |
36 | Giurgiulești Moldova Danube Oil Company | IM3-1.5-12 | Six storage silos of granulated cake | 2020 | |
37 | Dniprovs'ke Ukraine Dnipro starch and molasses combine | IM1-2.4-10 | Drying towers and cyclones of starch (Spray drying installation) | 2017 | |
IM1-2.4-10 | Drying towers and cyclones of starch (Spray drying installation) | 2017 | |||
IM1-2.4-10 | Drying towers and cyclones of starch (Spray drying installation) | 2017 | |||
IM1-2.4-13 | Drying towers and cyclones of starch (Spray drying installation) | 2021 | |||
IM1-2.4-13 | Drying towers and cyclones of starch (Spray drying installation) | 2021 | |||
IM1-2.4-13 | Drying towers and cyclones of starch (Spray drying installation) | 2021 | |||
IM1-2.4-13 | Drying towers and cyclones of starch (Spray drying installation) | 2021 | |||
38 | Donetsk Ukraine Donetsk iron and steel works | IM3-0.8-4 | Collecting hopper of a section of dust unloading ("Ladle-furnace" section) | 2003 | |
IM3-1.2-6 | 2 hoppers of a forming mixture (Mechanized foundry) | 2012 | |||
IM3-1.2-2 | 1 hopper of arm forming (Mechanized foundry) | 2012 | |||
IM3-1.2-8 | 8 hoppers of mix-making department (Mechanized foundry) | 2012 | |||
IM3-1.2-8 | 8 hoppers of mix-making department (Mechanized foundry) | 2012 | |||
IM3-1.8-2 | Reception hopper (Reserve unit for receiving and loading of bulk materials and ferroalloys) | 2013 | |||
39 | Donetsk Ukraine Donetsk bakery and confectionary combine | IM3-0.8-6 | 6 hoppers (Free-packing store of flour) | 1999 | |
IM1-1.2-12 | 12 production hoppers | 2001 | |||
IM3-0.8-7 | 6 hoppers (Free-packing store of flour) | 2005 | |||
IM1-1.2-8 | 8 production hoppers | 2005 | |||
IM1-1.2-10 | Production hoppers | 2009 | |||
IM3-0.8-10 | Hoppers (Free-packing store of flour) | 2009 | |||
IM1-1.2-3 | 3 production hoppers | 2012 | |||
IM3-0.8-4 | 3 hoppers (Free-packing store of flour) | 2012 | |||
40 | Donetsk Ukraine Confectionary factory A.V.K. | IM1-1.2-8 | 8 production hoppers | 2003 | |
41 | Drohobych Ukraine Drogobych bread-baking combine | IM1-1.2-16 | 16 production hoppers (Production department) | 1999 | |
42 | Dunaújváros Hungary ISD Dunaferr | IM3-1.9-16 | 8 hoppers of dust collection (Electric precipitator) | 2015 | |
IM4-1.8-12 | Hoppers №7, №8, №9 (Charge preparation shop) | 2016 | |||
IM4-1.8-12 | Hoppers №10, №11, №12 (Charge preparation shop) | 2017 | |||
43 | Yenakijeve Ukraine Yenakiieve iron and steel works | IM5-1.8-8 | 4 top hoppers of charge (Sintering department) | 2002 | |
IM4-1.8-14 | 6 hoppers of bin trestle (Blast-furnace shop) | 2014 | |||
IM4-1.8-14 | 6 hoppers of bin trestle (Blast-furnace shop) | 2014 | |||
44 | Yerevan Armenia Gayane ev Ani | IM1-1.2-12 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2010 | |
45 | Yerky Ukraine Katerynopilsky elevator | IM3-0.8-11 | 11 silos (Warehouse of mealy raw material) | 2006 | |
IM3-0.8-11 | 11 silos (Warehouse of mealy raw material) | 2006 | |||
IM3-0.8-10 | 10 silos (Warehouse of mineral raw material) | 2006 | |||
IM3-0.8-10 | 10 silos (Warehouse of mineral raw material) | 2006 | |||
IM3-0.8-12 | 12 silos (Warehouse of mineral raw material) | 2006 | |||
IM3-0.8-12 | 12 silos (Warehouse of mineral raw material) | 2006 | |||
46 | Yeruda Russia Olimpiada ore mining and processing enterprise | IM4-1.8-16 | 4 reception hoppers of crushed ore (Gold concentration plant-2) | 2014 | |
47 | Zhairem Kazakhstan Zhairem ore mining and processing combine | IM5-1.8-8 | Reception hopper of delivered ore (Concentration plant) | 2015 | |
IM4-1.8-14 | Hopper (Casing of screening and secondary fragmentation) | 2018 | |||
IM4-1.8-15 | 5 hoppers (Storage of fine-crushed ore of ore batching unit) | 2018 | |||
IM4-1.8-15 | 5 hoppers (Storage of fine-crushed ore of ore batching unit) | 2018 | |||
IM4-1.8-16 | Reception hopper (Coarse crushing section) | 2018 | |||
IM4-1.8-6 | 2 hoppers (Workshop of heavy medium separation) | 2018 | |||
IM4-1.8-12 | Concrete hopper (Store of washed ore) | 2021 | |||
IM4-1.8-12 | Concrete hopper (Store of washed ore) | 2021 | |||
48 | Zheleznogorsk Russia Mykhailovsky ore mining and processing plant | IM5-0.8-16 | 7 hoppers with limestone | 2006 | |
IM5-0.8-7 | 7 hoppers with limestone | 2008 | |||
49 | Zhytomyr Ukraine Zhytomyrkhlib | IM1-1.2-7 | 7 production hoppers | 2003 | |
50 | Zaporizhzhia Ukraine Zaporizhstal | IM3-0.8-4 | Collecting hopper of a section of dust unloading (Blast-furnace shop) | 2004 | |
IM3-0.8-14 | Hoppers of dust collection of electric precipitator (Sintering department) | 2011 | |||
IM3-0.8-14 | Hoppers of dust collection of electric precipitator (Sintering department) | 2011 | |||
IM3-1.8-5 | Dust hopper and dust pipe out of electric precipitator of sinter machine №1 (Sintering department) | 2012 | |||
IM5-1.8-12 | 3 hoppers under wagon dumper of base coal store of coal injection system BF2-5 (Blast-furnace shop) | 2013 | |||
IM3-1.5-2 | Hopper of dust collection of bin trestle BF-4 (Blast-furnace shop) | 2014 | |||
IM3-1.5-4 | 2 hoppers of dust at casting yard BF-4 (Blast-furnace shop) | 2014 | |||
IM3-1.5-4 | 2 dust hoppers of aspiration system of casting yard BF-2 (Blast-furnace shop) | 2016 | |||
IM3-1.5-4 | 2 dust hoppers of aspiration system of casting yard BF-3 (Blast-furnace shop) | 2016 | |||
IM3-1.1-10 | 8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines №№ 1-3 (Sintering department) | 2019 | |||
IM3-1.1-10 | 8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines (Sintering department) | 2019 | |||
51 | Zaporizhzhia Ukraine UkrNIIOGas | IM3-0.8-4 | 4 hoppers with dust | 2006 | |
52 | Zaporizhzhia Ukraine Dneprospetsstal | IM5-0.8-10 | 10 hoppers (Dosage section) | 2005 | |
53 | Zaporizhzhia Ukraine Ukrainsky graphit | IM3-0.8-11 | 11 hoppers of dosage section (Workshop №2) | 2001 | |
IM3-0.8-2 | Hopper for dust of furnace №4 (Workshop №2) | 2002 | |||
IM3-0.8-9 | 9 hoppers of dosage section (Workshop №2) | 2002 | |||
54 | Zaporizhzhia Ukraine Agroservis 2000 | IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 2005 | |
55 | Zaporizhzhia Ukraine Zaporozhye mechanised bakery №3 | IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 2007 | |
56 | Zaporizhzhia Ukraine Zaporozhye abrasive combine | IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |
IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |||
57 | Zestafoni Georgia Georgian Manganezi | IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2013 | |
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
58 | Zyryanovsk Kazakhstan Mining and concentrating complex "Altay" | IM3-1.2-4 | Transfer unit (chute) of B1 line (Thickening and filtration section of concentrates in body №1) | 2012 | |
IM3-1.9-6 | Reception hopper (Unit №3 ЦРООФ) | 2014 | |||
IM3-1.2-4 | Transfer unit (chute) of B2 line (Thickening and filtration section of concentrates in body №1) | 2014 | |||
IM3-1.2-4 | Transfer unit (chute) of B4 line (Thickening and filtration section of concentrates in body №1) | 2014 | |||
IM3-1.5-6 | 2 receptive hoppers (№1,2) of copper concentrate (Thickening and filtration section of concentrates) | 2017 | |||
59 | Illintsi Ukraine Lustdorf | IM1-2.4-7 | Drying tower and cyclones (Installation of milk drying) | 2015 | |
60 | Irkutsk Russia "Irkutskenergo" branch of Novo-Irkutsk Thermal Power Station (TPS) | IM4-1.8-12 | 3 reception hoppers (Wagon dumper of line Б) | 2014 | |
IM4-1.8-12 | 3 reception hoppers (Wagon dumper of line A) | 2015 | |||
61 | Kalynivka Ukraine Kalinovka machine building plant | IM1-1.2-15 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2004 | |
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2004 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2004 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2004 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2004 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-13 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM2-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM2-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2006 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |||
IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |||
IM2-1.2-7 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2008 | |||
IM2-1.2-7 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2008 | |||
IM2-1.2-12 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2008 | |||
IM2-1.2-12 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2008 | |||
IM2-1.2-7 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2009 | |||
IM2-1.2-10 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2010 | |||
IM2-1.2-6 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2010 | |||
IM1-2.4-6 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2011 | |||
IM1-2.4-9 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2011 | |||
IM1-2.4-7 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2011 | |||
IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2011 | |||
IM1-2.4-16 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2011 | |||
IM1-2.4-7 | Drying tower and cyclones (Drying spraying installation) | 2014 | |||
62 | Kam'yanets'-Podil's'kyi Ukraine Lactis "Subsidiary Enterprise "Aromat" | IM1-1.2-11 | Drying tower and cyclones (Spray drying installation) | 2005 | |
63 | Kamianske Ukraine Mechanized bakery № 3 | IM1-1.2-13 | 13 production hoppers | 1995 | |
IM1-1.2-13 | 13 production hoppers | 1995 | |||
IM1-1.2-13 | 5 production hoppers (Rolls and buns production unit) | 1995 | |||
IM3-0.8-16 | 15 hoppers (Free-packing store of flour) | 1996 | |||
64 | Kamianske Ukraine Dneprovsky Integratediron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2003 | |
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2003 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2004 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2004 | |||
IM3-0.8-6 | 3 hoppers of a section of dust unloading of blast furnace №10 (Blast-furnace shop) | 2006 | |||
IM3-0.8-6 | 3 hoppers of a section of dust unloading of blast furnace №10 (Blast-furnace shop) | 2006 | |||
IM5-1.8-6 | 8 hoppers charge compartment (Sintering department) | 2008 | |||
IM5-1.8-12 | 8 hoppers charge compartment (Sintering department) | 2008 | |||
IM4-1.8-16 | 2 reception coal hoppers under wagon dumper. Coal dust fuel system (Blast-furnace shop) | 2013 | |||
65 | Kaniv Ukraine Kaniv branch of "CHEESE CLUB" Ltd. | IM2-1.2-11 | Drying tower and cyclones (Dry whey production workshop №1) | 2005 | |
66 | Karakan Russia incision "Vinogradovskiy” - branch “Kuzbasskaya Toplivnaya Company” (KTC) | IM5-1.8-8 | Receptive hopper (Concentration plant "Kaskad-1") | 2011 | |
IM5-1.8-8 | JOY chute and conveyor chute 2.31 (Concentration plant "Kaskad-1") | 2011 | |||
IM3-1.2-6 | Screen pan in sorting-plant house (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-8 | Hopper of rock removal (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 accumulating hoppers of 2-nd production line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 transfer hoppers of rock materials and chutes of their conveyors (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 accumulating hoppers of 1-st production line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | Screening hopper (Crushing and sorting complex) | 2012 | |||
IM4-1.8-18 | Receptive hopper of 2-nd line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-18 | Receptive hopper of 1st line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 4 hoppers of finished product (Concentration plant "Kaskad-2") | 2012 | |||
67 | Kyiv Ukraine Confectionary factory A.V.K. (Kyiv) | IM1-1.2-5 | 5 production hoppers | 2002 | |
68 | Kyiv Ukraine Kyiv mechanized bakery №6 | IM1-1.2-7 | 7 production hoppers | 2000 | |
IM1-1.2-7 | 7 production hoppers | 2001 | |||
IM1-1.2-10 | 10 production hoppers | 2001 | |||
69 | Kyiv Ukraine "Kyivkhlib" Workshop №1 | IM3-0.8-15 | 15 hoppers (Free-packing store of flour) | 2001 | |
IM1-1.2-7 | 7 production hoppers | 2001 | |||
IM1-1.2-7 | 7 production hoppers | 2001 | |||
IM1-1.2-9 | 9 production hoppers | 2002 | |||
IM1-1.2-8 | 8 production hoppers | 2002 | |||
70 | Kyiv Ukraine Kyiv mechanized bakery №4 | IM1-1.2-8 | 8 production hoppers (Production department) | 2001 | |
IM2-1.2-3 | 3 production hoppers (Production department) | 2003 | |||
71 | Kyiv Ukraine Mechanized bakery №1 | IM1-1.2-5 | 5 production hoppers | 2005 | |
72 | Kingisepp Russia PG "Phosphorite" | IM3-1.2-8 | Unloading hopper with phosphohemihydrate | 2011 | |
IM3-1.2-8 | Unloading hopper of rotary vacuum filter | 2013 | |||
IM3-1.5-6 | Hopper of phospho-hemihydrate pos.1163 (Workshop of extraction phosphoric acid) | 2015 | |||
IM3-1.5-10 | Hopper of phospho-hemihydrate БТ-3 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 1163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 4163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hoppers of phosphate raw materials pos. 1114/1,2, pos. 3114/1,2 (Workshop of extraction phosphoric acid) | 2017 | |||
73 | Kirovsk Russia Apatite-nepheline beneficiation plant-3, Kirov branch of JSC "Apatit" | IM3-1.9-8 | 1 hopper with 4 outlets (Loading unit of apatite/nepheline concentrate) | 2016 | |
74 | Kirovsk Russia Oleniy Ruchey | IM3-1.5-12 | 12 hoppers of apatite-nepheline rock (Loading unit of apatite/nepheline rock) | 2012 | |
IM4-1.8-6 | Hopper (Coarse crushing section) | 2013 | |||
IM4-1.8-6 | Hopper (Medium and fine crushing section) | 2013 | |||
IM3-1.5-4 | 6 hoppers (Casing of filtration and drying) | 2013 | |||
IM3-1.9-16 | 4 silos (Silos warehouse of apatite and nepheline concentrate) | 2013 | |||
IM4-1.8-6 | 3 hoppers of second turn (Coarse crushing workshop) | 2015 | |||
75 | Kokshetau Kazakhstan Altyntau Kokshetau | IM5-1.8-12 | 4 hoppers of ore (Gold concentration plant) | 2010 | |
IM3-1.9-15 | 3 coal hoppers (Boiler house) | 2020 | |||
IM4-1.8-14 | Hoppers pos. 2.5.1, 2.5.2, 2.8.1, 2.8.2 and two bypass chutes of housing of gold extracting factory (Unit of fine crushing and shredding) | 2020 | |||
76 | Konotop Ukraine Konotop dairy factory | IM1-1.2-11 | Installation for manufacture of dry milk | 2007 | |
77 | Kostyantynivka Ukraine Konstantinovka confectionery factory | IM3-0.6-5 | Hoppers (Free-packing store of flour) | 2010 | |
78 | Kostomuksha Russia Karelsky Okatysh | IM4-1.8-16 | 8 hoppers of iron ore (Supply section of iron ore of main building of crushing and processing plant) | 2013 | |
79 | Košice Slovakia U.S. Steel Kosice | IM4-1.6-14 | Hopper of drum mixer (Sintering plant) | 2008 | |
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2008 | |||
IM4-1.6-10 | Dust collecting tower (Blast-furnace shop) | 2008 | |||
IM3-1.2-9 | 9 hoppers of dust collection of electric precipitator (Sintering plant) | 2008 | |||
IM3-1.2-9 | 9 hoppers of dust collection of electric precipitator (Sintering plant) | 2008 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
IM4-1.6-14 | Hopper of drum mixer (Sintering plant) | 2011 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
80 | Kryvyi Rih Ukraine ArcelorMittal Kryvyi Rih | IM5-1.8-16 | 4 refilling chutes of feeders of hammer crusherers (Sintering department-3) | 1997 | |
IM5-0.6-6 | 6 production hoppers (Sintering department-2) | 1998 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-2) | 1998 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-1) | 2000 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-1) | 2000 | |||
IM3-0.8-6 | 6 production hoppers (Sintering department-1) | 2000 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-2) | 2000 | |||
IM5-1.8-12 | 6 charging chutes of sinter machines (Sintering department-1) | 2003 | |||
IM5-1.8-12 | 6 hoppers of limestone screening section (Sintering department-3) | 2003 | |||
IM5-1.8-12 | 6 charging chutes of sinter machines (Sintering department-2) | 2004 | |||
IM2-1.2-3 | Bag filter (Shaped steel casting workshop) | 2004 | |||
IM2-1.2-3 | Bag filter (Shaped steel casting workshop) | 2004 | |||
IM2-1.2-6 | Bag filter (Refractory and calciferous workshop) | 2004 | |||
IM5-1.8-14 | 2 unloading chutes of conveyers, 6 loading and 6 unloading chutes of drums of secondary mixing. (Sintering department-1) | 2005 | |||
IM3-0.8-6 | Bag filter (Refractory and calciferous workshop) | 2005 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of bin trestle DP № 8 (Blast-furnace plant-1) | 2007 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of casting yard DP № 8 (Blast-furnace plant-1) | 2007 | |||
IM5-1.8-16 | 2 hoppers of ore of dosage section (Sintering department-3) | 2007 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-2) | 2009 | |||
IM5-1.8-16 | 2 hoppers of ore of dosage section (Sintering department-3) | 2009 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-1) | 2012 | |||
IM3-1.8-4 | Hopper of dust collection of aspiration system of casting yard and bin trestle BF-6 (Blast-furnace plant-1) | 2013 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-2) | 2014 | |||
IM3-2.3-16 | 2 hoppers with limestone of charge hoppers block (Sintering department-3) | 2014 | |||
IM3-1.1-16 | Dust hoppers of electric precipitator of sinter machine №6 (Sintering department-2) | 2016 | |||
IM3-1.1-16 | Dust hoppers of bag filter of sinter machine №5 (Sintering department-2) | 2017 | |||
IM3-1.1-16 | Dust hoppers of precipitator of sintering machine №4 (Sintering department-2) | 2019 | |||
IM4-1.8-24 | 6 hoppers of sintering machines (top and bottom tiers) (Sintering department-2) | 2020 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of bin trestle DP № 8 (Blast-furnace plant-1) | 2021 | |||
81 | Kryvyi Rih Ukraine Ternovka mechanized bakery | IM1-1.2-10 | 10 production hoppers | 1994 | |
IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 1994 | |||
82 | Kryvyi Rih Ukraine Krivorozhsky bakery combine №4 | IM3-0.8-6 | 6 hoppers (Free-packing store of flour) | 1994 | |
IM1-1.2-8 | 5 production hoppers | 1994 | |||
83 | Kryvyi Rih Ukraine Voskhod | IM5-0.8-13 | 8 hoppers of crushed stone | 2004 | |
84 | Kryvyi Rih Ukraine Krivorozhsky bakery combine №1 | IM3-0.8-12 | 12 hoppers (Free-packing store of flour) | 1994 | |
IM3-0.8-12 | 12 hoppers (Free-packing store of flour) | 1994 | |||
IM1-1.0-7 | 7 production hoppers | 1995 | |||
85 | Kryvyi Rih Ukraine Kryvyi Rih grain-producing integrated works №1 | IM3-0.8-15 | 15 hoppers with bran | 1995 | |
IM3-0.8-2 | 2 hoppers with chaff (Base of goods supply) | 1996 | |||
IM3-0.8-7 | 7 hoppers with flour (Free-packing store of flour) | 1996 | |||
IM3-0.8-11 | 11 hoppers (Free-packing store of flour) | 1997 | |||
86 | Kryvyi Rih Ukraine Severny ore mining and processing plant | IM3-1.1-5 | 5 hoppers (Concentrate storage) | 1993 | |
IM4-1.8-12 | Hoppers of charge №№2.7 and 2.2 of pelletization and roasting body №1 of pelletization unit of pellets production workshop №1 of concentrate pelletization factory-2 (Ore treatment plant) | 2019 | |||
IM4-1.8-16 | Hopper of charge №2-6 of pelletization and roasting body №1 of pelletization unit of pellets production workshop №1 of concentrate pelletization factory-2 (Ore treatment plant) | 2019 | |||
IM3-1.1-12 | 8 dust hoppers under two bag collectors with pulse regeneration 1800 and 2 collecting hoppers of crushing body in pellet manufacturing workshop №2 (Ore treatment plant) | 2020 | |||
IM3-0.8-5 | 4 dust hoppers of bag collectors with pulse regeneration 1800 and 1 cyclone CN-15-3350 of pellets shipment body in pellet manufacturing workshop №2 (Ore treatment plant) | 2020 | |||
IM3-0.8-2 | 2 dust hoppers under electric precipitator SH of roasting machine Lourghi-278-V of pellet manufacturing workshop №1 (Ore treatment plant) | 2020 | |||
87 | Kurakhove Ukraine DTEK Kurahovskaya CMF | IM5-1.8-4 | Coal hopper under wagon dumper (Wagon dumper building) | 2011 | |
88 | Курганча Uzbekistan SIYOB SHAVKAT ORZU | IM1-2.4-7 | Drying tower and cyclones (Spray drying installation) | 2019 | |
89 | Ladyzhyn Ukraine "Vinnytsia poultry farm", branch complex for manufacturing feeds" | IM3-1.2-9 | Hoppers (Oil pressing shop for sunflower seeds processing) | 2012 | |
IM3-1.2-8 | Hoppers (Oil pressing shop for sunflower seeds processing) | 2012 | |||
IM3-1.2-4 | 2 hoppers of corn dust (Oil pressing shop for sunflower seeds processing) | 2012 | |||
IM3-1.2-4 | 2 hoppers (Oil pressing shop for sunflower seeds processing) | 2012 | |||
IM3-1.2-4 | 2 hoppers (Oil pressing shop for sunflower seeds processing) | 2012 | |||
IM3-1.2-22 | 11 hoppers (Raw material storage) | 2012 | |||
IM3-1.2-12 | 12 hoppers (Dosing storage) | 2012 | |||
IM3-1.2-8 | 8 hoppers (Raw material storage) | 2012 | |||
90 | Lityn Ukraine Litinsky dairy factory | IM1-1.2-11 | Drying tower and cyclones (Spray drying installation) | 2002 | |
91 | Luhansk Ukraine Confectionary factory A.V.K. (Luhansk) | IM3-0.8-5 | 2 hoppers of free-packing store of flour 2 production hoppers (Free-packing store of flour, production department) | 2001 | |
92 | Lutsk Ukraine TEREMNO KHLEB | IM1-1.2-10 | 10 production hoppers | 2009 | |
IM1-1.2-7 | Hoppers №1 and №2 (Rolls and buns section)Нoppers №2 and №3 (Yeast section) | 2016 | |||
93 | Lyuban Belarus Nezhin mining and processing plant | IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |
IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |||
94 | Makiivka Ukraine Uniplast | IM1-0.8-5 | 5 production hoppers | 2007 | |
95 | Mamadysh Russia Mamadysh butter-cheese combine | IM1-1.2-11 | Drying tower and cyclones (Spray drying installation) | 2003 | |
IM2-1.2-8 | Drying tower and cyclones (Spray drying installation) | 2007 | |||
96 | Mariupol' Ukraine Ilyich iron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering plant) | 1994 | |
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering plant) | 1994 | |||
IM5-0.8-4 | 4 hoppers of a shaping section (Shaped steel casting workshop) | 1995 | |||
IM5-0.8-4 | 4 hoppers of a shaping section (Shaped steel casting workshop) | 1995 | |||
IM5-0.8-2 | 2 hoppers of a sand filling section (Shaped steel casting workshop) | 1995 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering plant) | 1996 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering plant) | 1996 | |||
IM3-0.8-14 | 14 hoppers of a section of cleaning of spill (Shaped steel casting workshop) | 1996 | |||
IM5-0.4-2 | 2 hoppers of a knockout section (Shaped steel casting workshop) | 1996 | |||
IM5-0.6-2 | 2 hoppers of a section of mixture preparation (Shaped steel casting workshop) | 1996 | |||
97 | Mariupol' Ukraine Azovstal Iron and Steel Works | IM5-1.8-14 | 7 collecting hoppers (Sintering plant) | 1992 | |
IM3-0.8-4 | 4 hoppers of a forming mixture (Mechanized foundry) | 1994 | |||
IM3-0.8-9 | 9 hoppers of a sand conditioning unit (Mechanized foundry) | 1994 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 1994 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 1994 | |||
IM5-1.8-8 | 2 hoppers of 31-nd mark (Sintering plant) | 1994 | |||
IM3-0.8-2 | Charging unit of a drum-mixer (Sintering plant) | 1995 | |||
IM5-0.4-1 | Reloading unit of the conveyor (Sintering plant) | 1995 | |||
IM5-0.4-1 | 1 hopper of a section of stuffing flasks (Mechanized foundry) | 1995 | |||
IM3-0.8-4 | Charging unit of drum-pelletizers (Sintering plant) | 1995 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 1995 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 1995 | |||
IM3-1.0-2 | 2 production hoppers (Sintering plant) | 1997 | |||
IM3-1.0-2 | 2 production hoppers (Sintering plant) | 1997 | |||
IM5-1.8-2 | 2 hoppers of CLD BF №3 (Blast-furnace plant) | 1997 | |||
IM5-1.8-2 | 2 hoppers of CLD BF №4 (Blast-furnace plant) | 1999 | |||
IM5-0.8-5 | 4 hoppers of gathering of dust BF №6 (Blast-furnace plant) | 2003 | |||
IM5-1.8-14 | 7 collecting hoppers (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 2003 | |||
IM5-1.8-8 | 2 hoppers of 31-nd mark (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 2003 | |||
IM5-1.8-8 | 4 reception hoppers (Sintering plant) | 2003 | |||
IM3-0.8-6 | Coke screens BF №2 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №3 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №4 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №5 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №6 (Blast-furnace plant) | 2005 | |||
IM3-0.8-2 | Charging unit of a drum-mixer (Sintering plant) | 2008 | |||
IM3-1.8-8 | 4 silos of coal preparation shop (Coke and chemical production) | 2008 | |||
IM3-0.8-4 | Charging unit of drum-pelletizers (Sintering plant) | 2008 | |||
98 | Mednogorsk Russia Mednogorsk copper-sulphur combine (MCSC) | IM3-0.8-16 | Dust collection hoppers (Aerodynamic losses furnace (ALF)) | 2010 | |
IM3-0.8-12 | Dust collection hoppers (Converters №2,3) | 2010 | |||
IM3-1.2-8 | Blocks of thermosyphons (Aerodynamic losses furnace (ALF)) | 2010 | |||
IM3-1.2-8 | Thermosiphons block (Converters №2,3) | 2010 | |||
99 | Minsk Belarus Institute of beef and dairy industry | IM1-2.4-4 | Dryer 2 cyclones hopper (Installation for drying of cheese whey) | 2012 | |
100 | Minsk Belarus Mechanized bakery №6 | IM3-0.8-9 | 9 hoppers of free-packing store of flour (Free-packing store of flour) | 2004 | |
IM3-0.8-9 | 9 hoppers of free-packing store of flour (Free-packing store of flour) | 2004 | |||
IM1-1.2-2 | 2 production hoppers (Puff products section) | 2005 | |||
IM2-1.2-8 | 8 production hoppers (Loaf line) | 2005 | |||
IM2-1.2-3 | 1 hopper (Mechanized bakery)2 hoppers (Product line of cakes) | 2005 | |||
IM3-0.8-4 | Hopper (Line of oat cookies) | 2005 | |||
IM2-1.2-14 | 14 production hoppers (Line of bread making) | 2006 | |||
101 | Minsk Belarus Mechanized bakery №4 | IM3-0.8-14 | 14 hoppers of free-packing store of flour (Free-packing store of flour) | 2004 | |
IM1-1.2-8 | 8 production hoppers | 2004 | |||
IM1-1.2-11 | 11 production hoppers | 2004 | |||
102 | Minsk Belarus Mechanized Bakery "Automat" | IM3-0.8-13 | 12 hoppers of free-packing store of flour (Free-packing store of flour) | 2004 | |
IM3-0.8-13 | 13 hoppers of free-packing store of flour (Free-packing store of flour) | 2004 | |||
IM1-1.2-5 | 5 production hoppers (Ferment section) | 2005 | |||
IM2-1.2-14 | 14 production hoppers | 2006 | |||
103 | Minsk Belarus Mechanized bakery №3 | IM3-0.8-12 | 12 hoppers of free-packing store of flour (Free-packing store of flour) | 2005 | |
IM3-0.8-2 | 2 hoppers of dry mealy section of free packing store of flow (Free-packing store of flour) | 2005 | |||
IM3-0.8-2 | 2 hoppers of a confectionary section of free-packing store of flow (Free-packing store of flour) | 2005 | |||
IM2-1.2-10 | 10 production hoppers (Ferment section) | 2005 | |||
IM1-1.2-2 | 2 production hoppers (Dry mealy section) | 2005 | |||
IM2-1.2-14 | 10 production hoppers (4-th floor) | 2005 | |||
104 | Minsk Belarus Mechanized bakery №5 | IM3-0.8-10 | 10 hoppers of free-packing store of flour (Bread production unit) | 2005 | |
IM3-0.8-4 | 4 hoppers of free-packing store of flour (Confectionery shop) | 2005 | |||
IM1-1.2-14 | 14 production hoppers (Bread production unit) | 2005 | |||
IM1-1.2-6 | 6 production hoppers (Confectionery shop) | 2005 | |||
105 | Myrhorod Ukraine Mirgorod cheese making combine | IM1-1.2-12 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2004 | |
IM1-2.4-3 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2012 | |||
106 | Myronivka Ukraine Mironovsky plantfor manufacturing of groats and mixed fodders | IM2-1.2-11 | 10 submeasuring hoppers and scales №2 (Fodder factory №1) | 2002 | |
IM5-0.8-12 | 12 silos of a warehouse of initial raw material (Finished products storage) | 2004 | |||
IM5-0.8-12 | 3 ash hoppers (Boiler room) | 2004 | |||
IM3-0.8-4 | 4 macromeasuring hoppers for mineral raw materials | 2004 | |||
IM3-0.8-2 | Hoppers with wastes | 2011 | |||
IM3-0.8-10 | 10 hoppers of finished product stock-room (Combined feed shop) | 2017 | |||
IM2-1.2-4 | 4 silos of granulation (Fodder factory №1) | 2018 | |||
107 | Mnogovershinnyy Russia Mnogovershynnoye | IM4-1.8-16 | 6 transfer hoppers (Ore preparation complex of protore) | 2019 | |
108 | Mogilev Belarus Mogilev dairy company Babushkina krynka | IM2-1.2-8 | Drying tower and cyclones (Spray drying installation) | 2007 | |
109 | Mospyne Ukraine Mospino CPP | IM3-1.2-3 | Transfer chute | 2010 | |
IM3-2.4-8 | 2 hoppers of mining rock | 2010 | |||
110 | Myski Russia Repair and production base KuzbassServis | IM4-1.8-8 | Hoppers, wagons | 2016 | |
111 | Naberezhnye Chelny Russia Agrosila-Moloko | IM2-1.2-8 | Drying tower and cyclones (Spray drying installation) | 2007 | |
112 | Nizhyn Ukraine Nizhyn khlib | IM3-0.8-11 | 11 hoppers (Free-packing store of flour) | 2001 | |
IM1-1.2-15 | 15 production hoppers (Bread and flour production unit) | 2005 | |||
113 | Mykolaiv Ukraine Mykolaiv mechanized bakery №1 | IM1-1.2-9 | 9 production hoppers (Production department) | 2001 | |
114 | Mykolaiv Ukraine European Trasport Stevedoring Company LLC | IM3-0.8-4 | 2 hoppers with splint ash under of electric precipitator (Boiler room) | 2020 | |
115 | Nikolayevsk-on-Amur Russia Belaya Gora | IM4-1.8-4 | Receptive hopper of crushed ore | 2019 | |
116 | Nikopol' Ukraine Poultry factory "Dneprovsky" | IM3-0.8-9 | 2 hoppers with bone flour | 2007 | |
117 | Novoamvrosiivs'ke Ukraine Amvrosiyevka branch PC "HeidelbergCement Ukraine" | IM3-1.2-6 | Dust collection hoppers of electric precipitator (Cement production) | 2008 | |
118 | Novohrad-Volyns'kyi Ukraine Novograd-Volynsky mechanized bakery | IM3-0.8-5 | 5 hoppers with flour (Free-packing store of flour) | 2015 | |
119 | Navahrudak Belarus Novogrudok butter-making combine | IM2-1.2-10 | Drying tower and cyclones (Spray drying installation) | 2007 | |
120 | Novokuznetsk Russia Central Concentration Factory "Abashevskaya" | IM3-1.9-16 | 8 accumulating hoppers of raw coal (Crushing and screening department) | 2017 | |
121 | Novokuznetsk Russia EVRAZ ZSMK | IM3-1.9-16 | 8 silos of closed coal storage (Coal preparation workshop of coke and by-product process) | 2015 | |
IM3-1.9-16 | 8 silos of indoor coal storage (Coal preparation workshop of coke and by-product process) | 2015 | |||
IM3-1.9-6 | 3 hoppers and pipe with ferro-alloys. (Electric steel melting workshop) | 2016 | |||
122 | Nokia Finland Nokian Tyres plc | IM3-1.1-6 | 1 silos with ZnO (Rubber mixing workshop) | 2016 | |
IM3-1.5-3 | 3 silos with ZnO (Rubber mixing workshop) | 2018 | |||
123 | Odesa Ukraine Tsement | IM3-1.2-4 | Hoppers of gypsum and slag (Line of cement milling) | 2009 | |
IM3-1.2-4 | Hoppers of gypsum and slag (Line of cement milling) | 2010 | |||
124 | Odesa Ukraine Lukoil Odessa oil refinery | IM2-1.2-4 | Furnace hoppers with chalk and 2 chutes | 2010 | |
125 | Odesa Ukraine Mechanized bakery №4 (Odesskiy Karavay) | IM3-0.8-12 | 12 hoppers (Free-packing store of flour) | 1994 | |
IM1-1.2-6 | 6 production hoppers | 1994 | |||
IM1-1.2-8 | 7 production hoppers | 1994 | |||
IM1-1.1-8 | 7 production hoppers | 1994 | |||
IM1-1.2-8 | 7 production hoppers | 1994 | |||
IM1-1.2-8 | 7 production hoppers | 2010 | |||
IM1-1.2-8 | 7 production hoppers | 2010 | |||
126 | Odesa Ukraine Mechanized bakery №1 | IM1-1.2-10 | 5 production hoppers | 1994 | |
IM3-0.8-14 | 14 hoppers (Free-packing store of flour) | 1994 | |||
IM1-1.2-8 | 8 production hoppers | 1995 | |||
127 | Odesa Ukraine Mechanized bakery №2 | IM1-1.2-13 | 13 production hoppers | 1994 | |
IM3-0.8-16 | 16 hoppers (Free-packing store of flour) | 2002 | |||
IM1-1.2-7 | 7 production hoppers | 2006 | |||
128 | Oluyaz Russia SPSSK Turgai | IM1-2.4-10 | Drying tower and cyclones (Spray drying installation) | 2019 | |
129 | Ol'shans'ke Ukraine "Yugtsement" branch of PC "Dyckerhoff Cement Ukraine" | IM3-0.6-1 | Chute of material feeding into furnace (Furnace №1) | 2010 | |
IM3-0.6-1 | Chute of material feeding into furnace (Furnace №2) | 2010 | |||
IM3-1.2-12 | 2 dust collection hoppers of furnace precipitator №1 (Clinker burning section) | 2010 | |||
IM3-0.8-2 | Hopper with slag (Dryer drum) | 2014 | |||
IM3-1.9-16 | 2 cinder hoppers СМ №1-№2 (Raw materials unit) | 2014 | |||
130 | Ostrava Czechia ArcelorMittal Ostrava a.s. | IM4-1.8-12 | Dust collecting tower (Blast-furnace shop) | 2013 | |
131 | Pervomais'kyi Ukraine Commercial Production Enterprise “Roma" | IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 2005 | |
132 | Pereyaslav-Khmel'nyts'kyi Ukraine MIZA (Pereiaslav bakery products) | IM3-0.8-11 | 11 hoppers (Free-packing store of flour) | 2004 | |
IM1-1.2-8 | 8 production hoppers | 2004 | |||
133 | Pryluky Ukraine Priluky mechanized bakery | IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 2004 | |
134 | Pruzhany Belarus Pruzhany dairy combine | IM2-1.2-8 | Drying tower and cyclones (Drying section) | 2007 | |
135 | Revda Russia Sredneuralsky copper-smelting plant (SCSP) | IM3-2.4-2 | Thermo-siphons of heat-recovery boiler (Copper-smelting plant) | 2012 | |
136 | Ridder Kazakhstan Ridder integrated iron and steel works | IM5-1.8-8 | Hopper with technogenic ore (Processing unit of technogenic raw materials РГОК) | 2012 | |
IM4-1.8-10 | Hopper with technogenic ore (Processing unit of technogenic raw materials РГОК) | 2014 | |||
IM4-1.8-18 | 3 furnace hoppers with charge (Waelz-shop) | 2015 | |||
IM3-1.1-5 | 5 transfer chutes (Waelz-shop) | 2015 | |||
137 | Ridder Kazakhstan Ridder mining and processing complex | IM3-1.5-4 | Cement silos | 2020 | |
138 | Rozhyshche Ukraine Rozhysche Cheese Factory | IM1-1.2-11 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2005 | |
139 | Romny Ukraine Romny bread-baking combine | IM1-1.2-10 | 10 production hoppers (Free-packing store of flour) | 2001 | |
IM3-0.8-10 | 10 hoppers (Free-packing store of flour) | 2002 | |||
140 | Romny Ukraine Romny dairy combine | IM2-1.2-11 | Drying tower and 3 cyclones (Packing section) | 2007 | |
141 | Ruzhyn Ukraine Ruzhin-moloko | IM1-1.2-11 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2006 | |
142 | Rykhal's'ke Ukraine Rykhalske milk powder factory | IM2-1.2-6 | Drying tower and cyclones (Spray drying installation) | 2010 | |
IM1-2.4-11 | Drying tower and cyclones (Spray drying installation) | 2014 | |||
143 | Salavat Russia Gazprom neftexim Salavat | IM3-1.2-8 | Fluidized bed installation | 2011 | |
144 | Saint Petersburg Russia ULTRA Fert | IM3-1.9-2 | 2 silos of complex mineral fertilizers (BN220 - tank for solidification and BN145 - buffer tank for surpluses) (Ammonium sulphate compaction) | 2017 | |
145 | Saint Petersburg Russia Khleb S-P | IM3-0.8-14 | 3 production hoppers | 2000 | |
IM3-0.8-14 | 5 production hoppers | 2002 | |||
146 | Sayanogorsk Russia Sayanmoloko | IM1-1.2-14 | Drying tower and cyclones (Drying spraying installation) | 2011 | |
147 | Dovzhansk Ukraine Termoantratsit | IM4-1.8-10 | Collecting hopper of mining mass and screen (Overloading station №2) | 2008 | |
148 | Smila Ukraine Smilaenergopromtrans | IM3-1.5-4 | Battery cyclone hopper with splint ash of purification system of exhaust gases (Steam boiler TS 20-39) | 2019 | |
149 | Salihorsk Belarus Belaruskali | IM5-1.8-16 | Reception surtaface ore hopper of pit head building 2 SDF (sylvinite dressing factory) (1 mining department) | 2010 | |
IM3-1.8-2 | Hopper of sylvinite ore 12 cubic meters of trans-shipping unit №2 of conveyor surface complex SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hoppers of sylvinite ore 450 cubic meters, crushing shop of Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hopper of sylvinite ore 450 cubic meters, crushing shop of surface complex, Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Hopper of pit head building 550 cubic meters of Berezovsky mine, SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5 of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5a of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Reception hopper of technical salt on railway track №6 of loading section, SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6а of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6b of loading department SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-16 | Hopper of finished product (3-rd railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
IM3-2.3-16 | Hopper of finished product (4-th railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
150 | Sorsk Russia Sorsk ferromolybdenum plant | IM3-1.9-18 | 9 chutes of cross conveyors within crushing department (Concentration plant) | 2013 | |
151 | Stavchany Ukraine Oliyar | IM3-1.2-20 | 20 hoppers of extraction cake granulation (Granulation section) | 2012 | |
IM3-1.2-19 | 19 hoppers of extraction cake granulation (Granulation section) | 2012 | |||
IM3-1.2-20 | 20 hoppers of extraction cake granulation (Granulation section) | 2012 | |||
IM3-1.2-19 | 19 hoppers of extraction cake granulation (Granulation section) | 2012 | |||
152 | Stary Oskol Russia Stoilensky mining and beneficiation plant | IM3-1.9-20 | 10 hoppers of charge | 2014 | |
IM3-1.9-16 | 6 hoppers of bentonite, concentrate and organic | 2014 | |||
IM4-1.8-4 | 2 hoppers of charge (charge preparation workshop) | 2019 | |||
153 | Suvorov Russia Cherepetskaya Thermal Power Plant | IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
154 | Sumy Ukraine Sumy dairy factory | IM1-1.2-11 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2005 | |
155 | Tavriis'k Ukraine Tavriysk feed mill | IM3-0.8-14 | 7 subhanged hoppers | 2004 | |
IM5-0.8-11 | Silos (Warehouse of mealy raw material) | 2004 | |||
IM5-0.8-11 | Silos (Warehouse of mealy raw material) | 2004 | |||
IM3-0.8-14 | 7 subhanged hoppers | 2004 | |||
156 | Tashkent Uzbekistan ASL OYNA | IM3-1.5-2 | Hopper of glass batch (Batch preparation workshop) | 2018 | |
157 | Temen-Suu Kyrgyzstan Ursus | IM1-2.4-6 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2013 | |
158 | Temirtau Kazakhstan ArcelorMittal Temirtau | IM3-1.9-16 | 4 silos (№№25-28) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |
IM3-1.9-16 | 4 silos (№№22-24) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№1-4) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№9-12) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№5-8) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№17-20) of closed coal storage-1 of coal beneficiation plant-2 (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№13-16) of CCS-1 (closed coal storage), CPS (coal preparation shop), CBP (coal benefitiation plant-2) (Сoke and by-product process) | 2016 | |||
IM3-2.3-20 | 10 silos with concentrate of measuring section (Сoke and by-product process) | 2017 | |||
IM3-2.3-20 | 10 silos with concentrate of measuring section (Сoke and by-product process) | 2017 | |||
IM4-1.8-12 | 3 hoppers under car dumper №3 (Сoke and by-product process) | 2017 | |||
IM4-1.8-8 | 4 hoppers under car dumpers №1 and №2 (Сoke and by-product process) | 2017 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №6 (Sinter production) | 2017 | |||
IM4-1.8-16 | 7 hoppers (№№201-206,208) of charge chain of sinter machine №5 of charge section (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers (№№207,209-214) of charge chain of sinter machine №5 of charge department (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers (№№215-221) of charge chain of sinter machine №5 of charge department. (Sinter production) | 2018 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №5 (Sinter production) | 2018 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №7 (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
159 | Troits'ke Ukraine Troitskoye butter-making factory | IM1-1.2-11 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2004 | |
160 | Troitskoye Russia Troitsky maslosyrodel | IM2-1.2-8 | Drying tower and cyclones (Drying spraying installations of brand А1-ОРЧ, А1-ОР2Ч-01) | 2007 | |
161 | Tula Russia Kosaya Gora iron works | IM5-1.8-12 | Hopper with dolomite and limestone of bin trestle of blasting furnace №1 (Blast-furnace shop) | 2010 | |
IM4-1.8-20 | The hopper with dolomite and limestone of bin trestle of blasting furnace № 1 (Blast-furnace shop) | 2011 | |||
162 | Tula Russia Tula dairy plant | IM1-2.4-7 | Drying tower and cyclones (Drying spraying installation) | 2018 | |
163 | Ust'-Kamenogorsk Kazakhstan Ust-Kamenogorsk metallurgical complex | IM4-1.8-8 | Hoppers of charge (Charge curing workshop of lead plant) | 2009 | |
IM4-1.8-8 | Hoppers of charge (Charge curing workshop of lead plant) | 2009 | |||
164 | Kharkiv Ukraine Khlebzavod Saltovsky" (Slobozhansky) | IM1-1.2-15 | 15 production hoppers | 1996 | |
IM1-1.2-15 | 15 production hoppers | 2015 | |||
165 | Kharkiv Ukraine Kharkiv mechanized bakery №8 | IM3-0.8-18 | 18 hoppers (Free-packing store of flour) | 1992 | |
166 | Kharkiv Ukraine Kharkov mechanized bakery №3 | IM1-1.2-12 | 12 production hoppers | 1998 | |
167 | Kharkiv Ukraine Kharkov mechanized bakery №1 (CJSC Alekseevsky mechanized bakery) | IM5-0.8-8 | 8 hoppers (Free-packing store of flour) | 1991 | |
IM5-0.8-8 | 8 hoppers (Free-packing store of flour) | 1991 | |||
IM1-1.2-12 | 12 production hoppers | 1998 | |||
168 | Kharkiv Ukraine Novo-Bavarsky mechanised bakery | IM1-1.2-3 | 3 production hoppers (Production department) | 2000 | |
169 | Kherson Ukraine Kherson mechanized bakery №2 | IM1-1.2-12 | 12 production hoppers | 2002 | |
170 | Kherson Ukraine Kherson mechanised bakery №3 | IM1-1.2-13 | 13 production hoppers | 2006 | |
171 | Khmil'nyk Ukraine RPE Vizit | IM1-2.4-7 | Drying tower and cyclones (Drying spraying installation) | 2018 | |
172 | Khmelnytskyi Ukraine Khmelnytskyi bread-bakery combine | IM1-1.2-14 | 14 production hoppers | 2002 | |
173 | Chervonohrad Ukraine Chervonograd mechanized bakery | IM1-1.2-8 | 8 production hoppers | 2001 | |
174 | Cherepovets Russia Apatit | IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №1) | 2006 | |
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №2) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №3) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №4) | 2008 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.2-6 | 2 hoppers for off-grade product (Section №1) | 2010 | |||
IM3-1.8-4 | 2 hoppers with potassium chloride (Section №2) | 2010 | |||
IM3-1.5-5 | 2 hoppers (0,6m3 и 2,4m3) of aluminium fluoride trihydrate (Aluminum fluoride workshop) | 2013 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.70 (Workshop of mineral fertilizers production) | 2013 | |||
IM1-2.4-1 | Chute of drying and calcination unit (Aluminum fluoride workshop) | 2015 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.67 (Workshop of mineral fertilizers production) | 2016 | |||
IM3-1.9-8 | 2 hoppers with apatite concentrate, section №1, b.2.12, 2.15 (Workshop of extraction phosphoric acid -1) | 2017 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.5-6 | 4 hoppers of finished products of unloading unit (Mineral fertilizers warehouse) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.5-4 | 2 fertilzer hoppers of housing 2.67 (Workshop of mineral fertilizers production) | 2021 | |||
175 | Cherepovets Russia Cherepovets iron and steel works | IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |
IM3-0.8-5 | 5 hoppers of dust collection of precipitator (Thermal heat and power station) | 2010 | |||
IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |||
IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |||
IM3-1.2-4 | Hopper with dust of fired dolomite | 2012 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
176 | Chernihiv Ukraine Chernihiv bread-baking combine | IM3-0.8-8 | 8 hoppers (Free-packing store of flour) | 2002 | |
IM1-1.2-5 | 5 production hoppers | 2002 | |||
177 | Chernihiv Ukraine Dolina | IM1-1.2-12 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2007 | |
178 | Chernihiv Ukraine Chernigovlenprom | IM2-1.2-8 | Drying tower and cyclones (Installation for manufacture of dry milk) | 2008 | |
179 | Chernihiv Ukraine Chernigovsky kashtan | IM2-1.2-12 | Installation for manufacture of dry milk | 2006 | |
180 | Charsk Kazakhstan Kazakhcement | IM4-1.8-24 | Hopper with clay and hopper with aleurolite (Workshop of raw materials preparation) | 2017 |