List of implemented installations IM of metallurgic, mining and processing, chemical, fuel and construction fields of industry
# | Address of implementation | Type of IM installations | Application field | Year of implementation (delivery) | |
---|---|---|---|---|---|
1 | Aktobe Kazakhstan Aktobe ferroalloy plant - branch of TNC "KAZCHROME" | IM4-1.8-16 | 4 hoppers of ore. Drying section of raw materials (МВ04) | 2018 | |
IM4-1.8-16 | 4 hoppers of ore. Drying section of raw materials (МВ04) | 2018 | |||
IM3-1.9-4 | 4 chutes. Drying section of raw materials (МВ04) | 2018 | |||
IM3-1.9-8 | Coke and anthracite hopper in charging unit of drying furnace №3 (МВ04) | 2019 | |||
IM3-1.9-8 | Coke and anthracite hopper in charging unit of drying furnace №3 (МВ04) | 2019 | |||
IM4-1.8-16 | 2 reception hoppers ander vagon-dumper of station of raw materials discharge (MV01) | 2019 | |||
IM4-1.8-16 | Hoppers of ore and quartzite of charge preparation section and its dosing (MV06) | 2022 | |||
2 | Alchevs'k Ukraine Alchevsk iron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2000 | |
IM5-1.8-12 | 6 hoppers of charge (Sintering department) | 2004 | |||
IM5-1.8-6 | Loading funnel and hoppers of coneless loading device of blast furnace №1 (Blast-furnace shop) | 2007 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2014 | |||
3 | Anadyr Russia Valunisty mine | IM4-1.8-20 | 4 receptive hoppers with mining mass | 2018 | |
IM4-1.8-8 | Receptive hopper | 2021 | |||
4 | Angarsk Russia Combined heat and power (CHP-10) branch PJSC "Irkutskenergo" | IM4-1.8-12 | 2 reception hoppers of coal ander vagon-dumper №1 (fuel supply workshop) | 2018 | |
IM4-1.8-12 | Two receptive hoppers of coal under wagon dumper (Fuel supply workshop) | 2021 | |||
5 | Balakovo Russia Balakovo branch of JSC "Apatit" | IM3-1.2-10 | Hoppers and chutes (Production section of mineral fertilizers) | 2008 | |
IM3-1.5-10 | Hopper with phosphogypsum hemihydrate | 2013 | |||
IM4-1.8-8 | Hopper with lump lime (Section of lime reception and preparation of lime milk in ЦНОСВиВ) | 2016 | |||
6 | Bilyts'ke Ukraine DTEK Oktyabrskaya CPP | IM3-2.4-8 | 2 reception hoppers with coal (Wagon dumping section) | 2012 | |
7 | Belorechensk Russia EuroChem Belorechensk Mineral Fertilizers | IM3-1.9-6 | Reception discharge hopper of apatite concentrate store №2 (Workshop of extraction phosphoric acid production) | 2015 | |
8 | Vanino Russia Daltransugol | IM4-1.8-16 | Receptive hoppers №3 and №4 of wagon dumper | 2017 | |
IM3-1.9-10 | Overload units from conveyors К 1А and К 1В to conveyors К 1.1А and К 1.1В (TCS tower) | 2018 | |||
IM3-1.9-13 | Overload units from К 1.1А and К 1.1В to conveyors К 3А, К 2А and K 2B (T1 tower) | 2018 | |||
IM3-1.9-15 | Overload units from conveyers К 3А, К 4А and К 4В to conveyors К 5А and К 5В (T6 tower) | 2018 | |||
IM3-1.9-6 | Overload units from conveyers К 5А and К 5В to conveyers К 6А and К 6В (T7 tower) | 2018 | |||
IM4-1.8-16 | Receptive hopper of wagon dumper | 2019 | |||
IM4-1.8-16 | Two feed hoppers under wagon dumper of 3rd line. | 2020 | |||
9 | Vyzyrka Ukraine TIS-Coal | IM3-1.5-16 | 6 hoppers of coal (Bulk terminal №3) | 2015 | |
IM3-1.5-8 | Sloping wall above spill baler (Wagon dumper №2) | 2020 | |||
10 | Volkhov Russia Volkhov branch of JSC "Apatit" | IM3-1.2-8 | 8 dust collection hoppers (Electric precipitator) | 2011 | |
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-8 | Dust collection hoppers (Electric precipitator) | 2012 | |||
IM3-1.2-4 | 2 hoppers of finished product (Finished products storage) | 2012 | |||
IM3-1.5-17 | 3 hoppers and cyclone (Operational section) | 2013 | |||
IM3-1.9-4 | Hopper with soda (Cascade reactor assembly for 1st stage of neutralization) | 2014 | |||
IM3-1.5-10 | Cyclone СДК-ЦН-33, absorber Venturi, chute moving from elevator to screen, chute moving from screw to dust hopper, chute moving from dust hopper to air screw feeder (mineral fertilizers production) | 2014 | |||
IM3-1.9-4 | Hopper of apatite concentrate pos.E5 (Production of extraction phosphoric acid) | 2016 | |||
IM3-1.5-8 | Two hoppers of soda (pos. 33 and pos.34) (Unit of 2-nd stage neutralization of polyphosphates production) | 2016 | |||
IM3-1.5-17 | Chute and 2 pipes (Production unit of double superphosphate of mineral fertilizers production) | 2017 | |||
IM3-1.5-3 | Interspersing chutes of mixing cylinder (mineral fertilizers production) | 2019 | |||
IM3-1.1-7 | Chutes T-3/1, T-3/2, T-4 (2 pcs.) of unloading unit of apatite concentrate (Production of extraction phosphoric acid) | 2021 | |||
11 | Vorkuta Russia Vorkutinskaya Mine | IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2006 | |
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
IM3-0.8-4 | Dust collection cyclones (Thermal air classifier (TAC) 300) | 2007 | |||
12 | Vorkuta Russia Severnaya Mine | IM5-1.8-10 | 4 chutes of accumulative hopper with coal | 2008 | |
IM5-1.8-8 | 5 chutes of accumulative hopper with coal | 2008 | |||
13 | Halytsynove Ukraine Mykolaiv alumina refinery | IM3-0.8-2 | 2 hoppers (Coagulation section) | 1993 | |
IM5-2.8-9 | 3 hoppers (Section of bauxite grinding) | 1993 | |||
IM5-2.8-9 | 3 hoppers (Section of bauxite grinding) | 1993 | |||
IM5-1.8-24 | 3 hoppers of bauxite (№4, №5, №7) 1-st and 2-nd tier (Wet milling section) | 2010 | |||
IM5-1.8-16 | 2 hoppers of bauxite (Wet milling section) | 2010 | |||
IM5-1.8-14 | 7 hoppers with boxite (Wet milling section) | 2014 | |||
IM5-1.8-16 | 2 hoppers with boxite (Wet milling section) | 2014 | |||
14 | Gomel Belarus Gomel chemical plant | IM3-1.5-18 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2012 | |
IM3-1.5-20 | Chutes, hoppers, cyclones (Workshop of hard-blending mineral fertilizers) | 2013 | |||
IM3-1.5-15 | Chutes, hoppers, cyclones (Workshop of granulated ammophos) | 2013 | |||
IM3-1.5-12 | 3 hoppers of phosphogypsum (pos.53,57,353) (Workshop of phosphoric acid) | 2016 | |||
15 | Horishni Plavni Ukraine Poltava ore mining and processing enterprise | IM3-1.5-5 | Dash plates of disintegrators of processing line №2 PF-1 (Pelletizing factory) | 2017 | |
IM3-1.5-5 | Dash plates of disintegrators of processing line №3 PF-2 (Pelletizing factory) | 2019 | |||
IM3-1.5-5 | Dash plates of disintegrators of processing line №1 PF-1 (Pelletizing factory) | 2019 | |||
IM3-1.5-5 | Dash plates of disintegrators of processing line №4 PF-2 (Pelletizing factory) | 2019 | |||
IM3-1.9-6 | 3 hoppers of shipping unit into carriages F&SC (Сrushing and processing plant) | 2019 | |||
IM3-1.9-8 | Receptive hopper of limestone (№3) of conveyer KD-1 of charge unit of pellet production workshop of gallery №2 (Pelletizing factory) | 2019 | |||
IM3-1.5-7 | Three reloading conveyor chutes: from K1 to K2 + autostella, from K2 to K3, from K3 to K6 F&CS (Сrushing and processing plant) | 2020 | |||
IM3-1.5-2 | Reloading chute from conveyer K4 to К11126 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-2 | Reloading conveyor chute from K3 to K4 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-6 | Three reloading chutes of conveyers: from K6 to K7, from K7 to K8, from K8 to K9 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.9-12 | Six reception hoppers along conveyor K6 F&SC (Сrushing and processing plant) | 2020 | |||
IM3-1.5-6 | 3 transhipment chutes from batchers №1,2,3 to conveyer K-1 F&SC (Сrushing and processing plant) | 2021 | |||
IM3-1.9-12 | 4 discharge chutes of hopper Б1 PF-2 (Pelletizing factory) | 2021 | |||
16 | Donetsk Ukraine Donetsk iron and steel works | IM3-0.8-4 | Collecting hopper of a section of dust unloading ("Ladle-furnace" section) | 2003 | |
IM3-1.2-6 | 2 hoppers of a forming mixture (Mechanized foundry) | 2012 | |||
IM3-1.2-2 | 1 hopper of arm forming (Mechanized foundry) | 2012 | |||
IM3-1.2-8 | 8 hoppers of mix-making department (Mechanized foundry) | 2012 | |||
IM3-1.2-8 | 8 hoppers of mix-making department (Mechanized foundry) | 2012 | |||
IM3-1.8-2 | Reception hopper (Reserve unit for receiving and loading of bulk materials and ferroalloys) | 2013 | |||
17 | Dunaújváros Hungary ISD Dunaferr | IM3-1.9-16 | 8 hoppers of dust collection (Electric precipitator) | 2015 | |
IM4-1.8-12 | Hoppers №7, №8, №9 (Charge preparation shop) | 2016 | |||
IM4-1.8-12 | Hoppers №10, №11, №12 (Charge preparation shop) | 2017 | |||
18 | Yenakijeve Ukraine Yenakiieve iron and steel works | IM5-1.8-8 | 4 top hoppers of charge (Sintering department) | 2002 | |
IM4-1.8-14 | 6 hoppers of bin trestle (Blast-furnace shop) | 2014 | |||
IM4-1.8-14 | 6 hoppers of bin trestle (Blast-furnace shop) | 2014 | |||
19 | Yeruda Russia Olimpiada ore mining and processing enterprise | IM4-1.8-16 | 4 reception hoppers of crushed ore (Gold concentration plant-2) | 2014 | |
20 | Zhairem Kazakhstan Zhairem ore mining and processing combine | IM5-1.8-8 | Reception hopper of delivered ore (Concentration plant) | 2015 | |
IM4-1.8-14 | Hopper (Casing of screening and secondary fragmentation) | 2018 | |||
IM4-1.8-15 | 5 hoppers (Storage of fine-crushed ore of ore batching unit) | 2018 | |||
IM4-1.8-15 | 5 hoppers (Storage of fine-crushed ore of ore batching unit) | 2018 | |||
IM4-1.8-16 | Reception hopper (Coarse crushing section) | 2018 | |||
IM4-1.8-6 | 2 hoppers (Workshop of heavy medium separation) | 2018 | |||
IM4-1.8-12 | Concrete hopper (Store of washed ore) | 2021 | |||
IM4-1.8-12 | Concrete hopper (Store of washed ore) | 2021 | |||
21 | Zheleznogorsk Russia Mykhailovsky ore mining and processing plant | IM5-0.8-16 | 7 hoppers with limestone | 2006 | |
IM5-0.8-7 | 7 hoppers with limestone | 2008 | |||
22 | Zaporizhzhia Ukraine Zaporizhstal | IM3-0.8-4 | Collecting hopper of a section of dust unloading (Blast-furnace shop) | 2004 | |
IM3-0.8-14 | Hoppers of dust collection of electric precipitator (Sintering department) | 2011 | |||
IM3-0.8-14 | Hoppers of dust collection of electric precipitator (Sintering department) | 2011 | |||
IM3-1.8-5 | Dust hopper and dust pipe out of electric precipitator of sinter machine №1 (Sintering department) | 2012 | |||
IM5-1.8-12 | 3 hoppers under wagon dumper of base coal store of coal injection system BF2-5 (Blast-furnace shop) | 2013 | |||
IM3-1.5-2 | Hopper of dust collection of bin trestle BF-4 (Blast-furnace shop) | 2014 | |||
IM3-1.5-4 | 2 hoppers of dust at casting yard BF-4 (Blast-furnace shop) | 2014 | |||
IM3-1.5-4 | 2 dust hoppers of aspiration system of casting yard BF-2 (Blast-furnace shop) | 2016 | |||
IM3-1.5-4 | 2 dust hoppers of aspiration system of casting yard BF-3 (Blast-furnace shop) | 2016 | |||
IM3-1.1-10 | 8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines №№ 1-3 (Sintering department) | 2019 | |||
IM3-1.1-10 | 8 hoppers and 2 prechambers of bag filter FRIR-6000 of gas cleaning installations of aspiration air of tail pieces of sinter machines (Sintering department) | 2019 | |||
23 | Zaporizhzhia Ukraine UkrNIIOGas | IM3-0.8-4 | 4 hoppers with dust | 2006 | |
24 | Zaporizhzhia Ukraine Dneprospetsstal | IM5-0.8-10 | 10 hoppers (Dosage section) | 2005 | |
25 | Zaporizhzhia Ukraine Ukrainsky graphit | IM3-0.8-11 | 11 hoppers of dosage section (Workshop №2) | 2001 | |
IM3-0.8-2 | Hopper for dust of furnace №4 (Workshop №2) | 2002 | |||
IM3-0.8-9 | 9 hoppers of dosage section (Workshop №2) | 2002 | |||
26 | Zaporizhzhia Ukraine Zaporozhye abrasive combine | IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |
IM3-1.2-8 | 2 bag filters (ФРКИ-360К) | 2006 | |||
27 | Zestafoni Georgia Georgian Manganezi | IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2013 | |
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
IM3-1.5-20 | 20 hoppers of bag filters (Melting shop furnace №4) | 2014 | |||
28 | Zyryanovsk Kazakhstan Mining and concentrating complex "Altay" | IM3-1.2-4 | Transfer unit (chute) of B1 line (Thickening and filtration section of concentrates in body №1) | 2012 | |
IM3-1.9-6 | Reception hopper (Unit №3 ЦРООФ) | 2014 | |||
IM3-1.2-4 | Transfer unit (chute) of B2 line (Thickening and filtration section of concentrates in body №1) | 2014 | |||
IM3-1.2-4 | Transfer unit (chute) of B4 line (Thickening and filtration section of concentrates in body №1) | 2014 | |||
IM3-1.5-6 | 2 receptive hoppers (№1,2) of copper concentrate (Thickening and filtration section of concentrates) | 2017 | |||
29 | Irkutsk Russia "Irkutskenergo" branch of Novo-Irkutsk Thermal Power Station (TPS) | IM4-1.8-12 | 3 reception hoppers (Wagon dumper of line Б) | 2014 | |
IM4-1.8-12 | 3 reception hoppers (Wagon dumper of line A) | 2015 | |||
30 | Kamianske Ukraine Dneprovsky Integratediron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2003 | |
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2003 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2004 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (Sintering department) | 2004 | |||
IM3-0.8-6 | 3 hoppers of a section of dust unloading of blast furnace №10 (Blast-furnace shop) | 2006 | |||
IM3-0.8-6 | 3 hoppers of a section of dust unloading of blast furnace №10 (Blast-furnace shop) | 2006 | |||
IM5-1.8-6 | 8 hoppers charge compartment (Sintering department) | 2008 | |||
IM5-1.8-12 | 8 hoppers charge compartment (Sintering department) | 2008 | |||
IM4-1.8-16 | 2 reception coal hoppers under wagon dumper. Coal dust fuel system (Blast-furnace shop) | 2013 | |||
31 | Karakan Russia incision "Vinogradovskiy” - branch “Kuzbasskaya Toplivnaya Company” (KTC) | IM5-1.8-8 | Receptive hopper (Concentration plant "Kaskad-1") | 2011 | |
IM5-1.8-8 | JOY chute and conveyor chute 2.31 (Concentration plant "Kaskad-1") | 2011 | |||
IM3-1.2-6 | Screen pan in sorting-plant house (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-8 | Hopper of rock removal (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 accumulating hoppers of 2-nd production line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 transfer hoppers of rock materials and chutes of their conveyors (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 2 accumulating hoppers of 1-st production line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | Screening hopper (Crushing and sorting complex) | 2012 | |||
IM4-1.8-18 | Receptive hopper of 2-nd line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-18 | Receptive hopper of 1st line (Concentration plant "Kaskad-2") | 2012 | |||
IM4-1.8-16 | 4 hoppers of finished product (Concentration plant "Kaskad-2") | 2012 | |||
32 | Kingisepp Russia PG "Phosphorite" | IM3-1.2-8 | Unloading hopper with phosphohemihydrate | 2011 | |
IM3-1.2-8 | Unloading hopper of rotary vacuum filter | 2013 | |||
IM3-1.5-6 | Hopper of phospho-hemihydrate pos.1163 (Workshop of extraction phosphoric acid) | 2015 | |||
IM3-1.5-10 | Hopper of phospho-hemihydrate БТ-3 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 1163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hopper of phospho-hemihydrate pos. 4163 (Workshop of extraction phosphoric acid) | 2017 | |||
IM3-1.5-8 | Hoppers of phosphate raw materials pos. 1114/1,2, pos. 3114/1,2 (Workshop of extraction phosphoric acid) | 2017 | |||
33 | Kirovsk Russia Apatite-nepheline beneficiation plant-3, Kirov branch of JSC "Apatit" | IM3-1.9-8 | 1 hopper with 4 outlets (Loading unit of apatite/nepheline concentrate) | 2016 | |
34 | Kirovsk Russia Oleniy Ruchey | IM3-1.5-12 | 12 hoppers of apatite-nepheline rock (Loading unit of apatite/nepheline rock) | 2012 | |
IM4-1.8-6 | Hopper (Coarse crushing section) | 2013 | |||
IM4-1.8-6 | Hopper (Medium and fine crushing section) | 2013 | |||
IM3-1.5-4 | 6 hoppers (Casing of filtration and drying) | 2013 | |||
IM3-1.9-16 | 4 silos (Silos warehouse of apatite and nepheline concentrate) | 2013 | |||
IM4-1.8-6 | 3 hoppers of second turn (Coarse crushing workshop) | 2015 | |||
35 | Kokshetau Kazakhstan Altyntau Kokshetau | IM5-1.8-12 | 4 hoppers of ore (Gold concentration plant) | 2010 | |
IM3-1.9-15 | 3 coal hoppers (Boiler house) | 2020 | |||
IM4-1.8-14 | Hoppers pos. 2.5.1, 2.5.2, 2.8.1, 2.8.2 and two bypass chutes of housing of gold extracting factory (Unit of fine crushing and shredding) | 2020 | |||
36 | Kostomuksha Russia Karelsky Okatysh | IM4-1.8-16 | 8 hoppers of iron ore (Supply section of iron ore of main building of crushing and processing plant) | 2013 | |
37 | Košice Slovakia U.S. Steel Kosice | IM4-1.6-14 | Hopper of drum mixer (Sintering plant) | 2008 | |
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2008 | |||
IM4-1.6-10 | Dust collecting tower (Blast-furnace shop) | 2008 | |||
IM3-1.2-9 | 9 hoppers of dust collection of electric precipitator (Sintering plant) | 2008 | |||
IM3-1.2-9 | 9 hoppers of dust collection of electric precipitator (Sintering plant) | 2008 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
IM4-1.6-14 | Hopper of drum mixer (Sintering plant) | 2011 | |||
IM4-1.6-10 | Charge hopper of sinter machine (Sintering plant) | 2011 | |||
38 | Kryvyi Rih Ukraine ArcelorMittal Kryvyi Rih | IM5-1.8-16 | 4 refilling chutes of feeders of hammer crusherers (Sintering department-3) | 1997 | |
IM5-0.6-6 | 6 production hoppers (Sintering department-2) | 1998 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-2) | 1998 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-1) | 2000 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-1) | 2000 | |||
IM3-0.8-6 | 6 production hoppers (Sintering department-1) | 2000 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-2) | 2000 | |||
IM5-1.8-12 | 6 charging chutes of sinter machines (Sintering department-1) | 2003 | |||
IM5-1.8-12 | 6 hoppers of limestone screening section (Sintering department-3) | 2003 | |||
IM5-1.8-12 | 6 charging chutes of sinter machines (Sintering department-2) | 2004 | |||
IM2-1.2-3 | Bag filter (Shaped steel casting workshop) | 2004 | |||
IM2-1.2-3 | Bag filter (Shaped steel casting workshop) | 2004 | |||
IM2-1.2-6 | Bag filter (Refractory and calciferous workshop) | 2004 | |||
IM5-1.8-14 | 2 unloading chutes of conveyers, 6 loading and 6 unloading chutes of drums of secondary mixing. (Sintering department-1) | 2005 | |||
IM3-0.8-6 | Bag filter (Refractory and calciferous workshop) | 2005 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of bin trestle DP № 8 (Blast-furnace plant-1) | 2007 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of casting yard DP № 8 (Blast-furnace plant-1) | 2007 | |||
IM5-1.8-16 | 2 hoppers of ore of dosage section (Sintering department-3) | 2007 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-2) | 2009 | |||
IM5-1.8-16 | 2 hoppers of ore of dosage section (Sintering department-3) | 2009 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering department-1) | 2012 | |||
IM3-1.8-4 | Hopper of dust collection of aspiration system of casting yard and bin trestle BF-6 (Blast-furnace plant-1) | 2013 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering department-2) | 2014 | |||
IM3-2.3-16 | 2 hoppers with limestone of charge hoppers block (Sintering department-3) | 2014 | |||
IM3-1.1-16 | Dust hoppers of electric precipitator of sinter machine №6 (Sintering department-2) | 2016 | |||
IM3-1.1-16 | Dust hoppers of bag filter of sinter machine №5 (Sintering department-2) | 2017 | |||
IM3-1.1-16 | Dust hoppers of precipitator of sintering machine №4 (Sintering department-2) | 2019 | |||
IM4-1.8-24 | 6 hoppers of sintering machines (top and bottom tiers) (Sintering department-2) | 2020 | |||
IM3-1.2-4 | Collecting hopper of a section of dust unloading of bin trestle DP № 8 (Blast-furnace plant-1) | 2021 | |||
39 | Kryvyi Rih Ukraine Voskhod | IM5-0.8-13 | 8 hoppers of crushed stone | 2004 | |
40 | Kryvyi Rih Ukraine Severny ore mining and processing plant | IM3-1.1-5 | 5 hoppers (Concentrate storage) | 1993 | |
IM4-1.8-12 | Hoppers of charge №№2.7 and 2.2 of pelletization and roasting body №1 of pelletization unit of pellets production workshop №1 of concentrate pelletization factory-2 (Ore treatment plant) | 2019 | |||
IM4-1.8-16 | Hopper of charge №2-6 of pelletization and roasting body №1 of pelletization unit of pellets production workshop №1 of concentrate pelletization factory-2 (Ore treatment plant) | 2019 | |||
IM3-1.1-12 | 8 dust hoppers under two bag collectors with pulse regeneration 1800 and 2 collecting hoppers of crushing body in pellet manufacturing workshop №2 (Ore treatment plant) | 2020 | |||
IM3-0.8-5 | 4 dust hoppers of bag collectors with pulse regeneration 1800 and 1 cyclone CN-15-3350 of pellets shipment body in pellet manufacturing workshop №2 (Ore treatment plant) | 2020 | |||
IM3-0.8-2 | 2 dust hoppers under electric precipitator SH of roasting machine Lourghi-278-V of pellet manufacturing workshop №1 (Ore treatment plant) | 2020 | |||
41 | Kurakhove Ukraine DTEK Kurahovskaya CMF | IM5-1.8-4 | Coal hopper under wagon dumper (Wagon dumper building) | 2011 | |
42 | Lyuban Belarus Nezhin mining and processing plant | IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |
IM4-1.8-12 | Receptive hopper (Crushing workshop) | 2021 | |||
43 | Makiivka Ukraine Uniplast | IM1-0.8-5 | 5 production hoppers | 2007 | |
44 | Mariupol' Ukraine Ilyich iron and steel works | IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering plant) | 1994 | |
IM5-1.8-12 | 6 hoppers of sinter machines (bottom tier) (Sintering plant) | 1994 | |||
IM5-0.8-4 | 4 hoppers of a shaping section (Shaped steel casting workshop) | 1995 | |||
IM5-0.8-4 | 4 hoppers of a shaping section (Shaped steel casting workshop) | 1995 | |||
IM5-0.8-2 | 2 hoppers of a sand filling section (Shaped steel casting workshop) | 1995 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering plant) | 1996 | |||
IM5-1.8-12 | 6 hoppers of sinter machines (top tier) (Sintering plant) | 1996 | |||
IM3-0.8-14 | 14 hoppers of a section of cleaning of spill (Shaped steel casting workshop) | 1996 | |||
IM5-0.4-2 | 2 hoppers of a knockout section (Shaped steel casting workshop) | 1996 | |||
IM5-0.6-2 | 2 hoppers of a section of mixture preparation (Shaped steel casting workshop) | 1996 | |||
45 | Mariupol' Ukraine Azovstal Iron and Steel Works | IM5-1.8-14 | 7 collecting hoppers (Sintering plant) | 1992 | |
IM3-0.8-4 | 4 hoppers of a forming mixture (Mechanized foundry) | 1994 | |||
IM3-0.8-9 | 9 hoppers of a sand conditioning unit (Mechanized foundry) | 1994 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 1994 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 1994 | |||
IM5-1.8-8 | 2 hoppers of 31-nd mark (Sintering plant) | 1994 | |||
IM3-0.8-2 | Charging unit of a drum-mixer (Sintering plant) | 1995 | |||
IM5-0.4-1 | Reloading unit of the conveyor (Sintering plant) | 1995 | |||
IM5-0.4-1 | 1 hopper of a section of stuffing flasks (Mechanized foundry) | 1995 | |||
IM3-0.8-4 | Charging unit of drum-pelletizers (Sintering plant) | 1995 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 1995 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 1995 | |||
IM3-1.0-2 | 2 production hoppers (Sintering plant) | 1997 | |||
IM3-1.0-2 | 2 production hoppers (Sintering plant) | 1997 | |||
IM5-1.8-2 | 2 hoppers of CLD BF №3 (Blast-furnace plant) | 1997 | |||
IM5-1.8-2 | 2 hoppers of CLD BF №4 (Blast-furnace plant) | 1999 | |||
IM5-0.8-5 | 4 hoppers of gathering of dust BF №6 (Blast-furnace plant) | 2003 | |||
IM5-1.8-14 | 7 collecting hoppers (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers (bottom tier) (Sintering plant) | 2003 | |||
IM5-1.8-8 | 2 hoppers of 31-nd mark (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 2003 | |||
IM5-1.8-10 | 5 charge hoppers ( top tier) (Sintering plant) | 2003 | |||
IM5-1.8-8 | 4 reception hoppers (Sintering plant) | 2003 | |||
IM3-0.8-6 | Coke screens BF №2 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №3 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №4 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №5 (Blast-furnace plant) | 2005 | |||
IM3-0.8-6 | Coke screens BF №6 (Blast-furnace plant) | 2005 | |||
IM3-0.8-2 | Charging unit of a drum-mixer (Sintering plant) | 2008 | |||
IM3-1.8-8 | 4 silos of coal preparation shop (Coke and chemical production) | 2008 | |||
IM3-0.8-4 | Charging unit of drum-pelletizers (Sintering plant) | 2008 | |||
46 | Mednogorsk Russia Mednogorsk copper-sulphur combine (MCSC) | IM3-0.8-16 | Dust collection hoppers (Aerodynamic losses furnace (ALF)) | 2010 | |
IM3-0.8-12 | Dust collection hoppers (Converters №2,3) | 2010 | |||
IM3-1.2-8 | Blocks of thermosyphons (Aerodynamic losses furnace (ALF)) | 2010 | |||
IM3-1.2-8 | Thermosiphons block (Converters №2,3) | 2010 | |||
47 | Mnogovershinnyy Russia Mnogovershynnoye | IM4-1.8-16 | 6 transfer hoppers (Ore preparation complex of protore) | 2019 | |
48 | Mospyne Ukraine Mospino CPP | IM3-1.2-3 | Transfer chute | 2010 | |
IM3-2.4-8 | 2 hoppers of mining rock | 2010 | |||
49 | Myski Russia Repair and production base KuzbassServis | IM4-1.8-8 | Hoppers, wagons | 2016 | |
50 | Mykolaiv Ukraine European Trasport Stevedoring Company LLC | IM3-0.8-4 | 2 hoppers with splint ash under of electric precipitator (Boiler room) | 2020 | |
51 | Nikolayevsk-on-Amur Russia Belaya Gora | IM4-1.8-4 | Receptive hopper of crushed ore | 2019 | |
52 | Novoamvrosiivs'ke Ukraine Amvrosiyevka branch PC "HeidelbergCement Ukraine" | IM3-1.2-6 | Dust collection hoppers of electric precipitator (Cement production) | 2008 | |
53 | Novokuznetsk Russia Central Concentration Factory "Abashevskaya" | IM3-1.9-16 | 8 accumulating hoppers of raw coal (Crushing and screening department) | 2017 | |
54 | Novokuznetsk Russia EVRAZ ZSMK | IM3-1.9-16 | 8 silos of closed coal storage (Coal preparation workshop of coke and by-product process) | 2015 | |
IM3-1.9-16 | 8 silos of indoor coal storage (Coal preparation workshop of coke and by-product process) | 2015 | |||
IM3-1.9-6 | 3 hoppers and pipe with ferro-alloys. (Electric steel melting workshop) | 2016 | |||
55 | Nokia Finland Nokian Tyres plc | IM3-1.1-6 | 1 silos with ZnO (Rubber mixing workshop) | 2016 | |
IM3-1.5-3 | 3 silos with ZnO (Rubber mixing workshop) | 2018 | |||
56 | Odesa Ukraine Tsement | IM3-1.2-4 | Hoppers of gypsum and slag (Line of cement milling) | 2009 | |
IM3-1.2-4 | Hoppers of gypsum and slag (Line of cement milling) | 2010 | |||
57 | Odesa Ukraine Lukoil Odessa oil refinery | IM2-1.2-4 | Furnace hoppers with chalk and 2 chutes | 2010 | |
58 | Ol'shans'ke Ukraine "Yugtsement" branch of PC "Dyckerhoff Cement Ukraine" | IM3-0.6-1 | Chute of material feeding into furnace (Furnace №1) | 2010 | |
IM3-0.6-1 | Chute of material feeding into furnace (Furnace №2) | 2010 | |||
IM3-1.2-12 | 2 dust collection hoppers of furnace precipitator №1 (Clinker burning section) | 2010 | |||
IM3-0.8-2 | Hopper with slag (Dryer drum) | 2014 | |||
IM3-1.9-16 | 2 cinder hoppers СМ №1-№2 (Raw materials unit) | 2014 | |||
59 | Ostrava Czechia ArcelorMittal Ostrava a.s. | IM4-1.8-12 | Dust collecting tower (Blast-furnace shop) | 2013 | |
60 | Revda Russia Sredneuralsky copper-smelting plant (SCSP) | IM3-2.4-2 | Thermo-siphons of heat-recovery boiler (Copper-smelting plant) | 2012 | |
61 | Ridder Kazakhstan Ridder integrated iron and steel works | IM5-1.8-8 | Hopper with technogenic ore (Processing unit of technogenic raw materials РГОК) | 2012 | |
IM4-1.8-10 | Hopper with technogenic ore (Processing unit of technogenic raw materials РГОК) | 2014 | |||
IM4-1.8-18 | 3 furnace hoppers with charge (Waelz-shop) | 2015 | |||
IM3-1.1-5 | 5 transfer chutes (Waelz-shop) | 2015 | |||
62 | Ridder Kazakhstan Ridder mining and processing complex | IM3-1.5-4 | Cement silos | 2020 | |
63 | Salavat Russia Gazprom neftexim Salavat | IM3-1.2-8 | Fluidized bed installation | 2011 | |
64 | Saint Petersburg Russia ULTRA Fert | IM3-1.9-2 | 2 silos of complex mineral fertilizers (BN220 - tank for solidification and BN145 - buffer tank for surpluses) (Ammonium sulphate compaction) | 2017 | |
65 | Dovzhansk Ukraine Termoantratsit | IM4-1.8-10 | Collecting hopper of mining mass and screen (Overloading station №2) | 2008 | |
66 | Smila Ukraine Smilaenergopromtrans | IM3-1.5-4 | Battery cyclone hopper with splint ash of purification system of exhaust gases (Steam boiler TS 20-39) | 2019 | |
67 | Salihorsk Belarus Belaruskali | IM5-1.8-16 | Reception surtaface ore hopper of pit head building 2 SDF (sylvinite dressing factory) (1 mining department) | 2010 | |
IM3-1.8-2 | Hopper of sylvinite ore 12 cubic meters of trans-shipping unit №2 of conveyor surface complex SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hoppers of sylvinite ore 450 cubic meters, crushing shop of Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Collecting hopper of sylvinite ore 450 cubic meters, crushing shop of surface complex, Berezovsky mine SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.4-16 | Hopper of pit head building 550 cubic meters of Berezovsky mine, SDF (sylvinite dressing factory) (1 mining department) | 2012 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5 of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Technical salt reception hopper on railway track №5a of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-4 | Reception hopper of technical salt on railway track №6 of loading section, SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6а of loading section SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-8 | 2 reception hoppers of fine grained potassium chloride on railway track №6b of loading department SDF (sylvinite dressing factory) (1 mining department) | 2013 | |||
IM3-2.3-16 | Hopper of finished product (3-rd railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
IM3-2.3-16 | Hopper of finished product (4-th railroad track) of loading workshop #1 SDF (2 mining department) | 2017 | |||
68 | Sorsk Russia Sorsk ferromolybdenum plant | IM3-1.9-18 | 9 chutes of cross conveyors within crushing department (Concentration plant) | 2013 | |
69 | Stary Oskol Russia Stoilensky mining and beneficiation plant | IM3-1.9-20 | 10 hoppers of charge | 2014 | |
IM3-1.9-16 | 6 hoppers of bentonite, concentrate and organic | 2014 | |||
IM4-1.8-4 | 2 hoppers of charge (charge preparation workshop) | 2019 | |||
70 | Suvorov Russia Cherepetskaya Thermal Power Plant | IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
IM3-4.8-4 | Wagon dumper ВРС93-110М1 (Coal reception unit) | 2012 | |||
71 | Tashkent Uzbekistan ASL OYNA | IM3-1.5-2 | Hopper of glass batch (Batch preparation workshop) | 2018 | |
72 | Temirtau Kazakhstan ArcelorMittal Temirtau | IM3-1.9-16 | 4 silos (№№25-28) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |
IM3-1.9-16 | 4 silos (№№22-24) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№1-4) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№9-12) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№5-8) CCS-1 (closed coal storage), CPS (coal preparation shop), CBP-2 (coal beneficiation plant) (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№17-20) of closed coal storage-1 of coal beneficiation plant-2 (Сoke and by-product process) | 2016 | |||
IM3-1.9-16 | 4 silos (№№13-16) of CCS-1 (closed coal storage), CPS (coal preparation shop), CBP (coal benefitiation plant-2) (Сoke and by-product process) | 2016 | |||
IM3-2.3-20 | 10 silos with concentrate of measuring section (Сoke and by-product process) | 2017 | |||
IM3-2.3-20 | 10 silos with concentrate of measuring section (Сoke and by-product process) | 2017 | |||
IM4-1.8-12 | 3 hoppers under car dumper №3 (Сoke and by-product process) | 2017 | |||
IM4-1.8-8 | 4 hoppers under car dumpers №1 and №2 (Сoke and by-product process) | 2017 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №6 (Sinter production) | 2017 | |||
IM4-1.8-16 | 7 hoppers (№№201-206,208) of charge chain of sinter machine №5 of charge section (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers (№№207,209-214) of charge chain of sinter machine №5 of charge department (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers (№№215-221) of charge chain of sinter machine №5 of charge department. (Sinter production) | 2018 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №5 (Sinter production) | 2018 | |||
IM4-1.8-16 | 4 hoppers of sinter machine №7 (Sinter production) | 2018 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №6 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
IM4-1.8-16 | 7 hoppers of charge chain of sinter machine №7 of charge section (Sinter production) | 2019 | |||
73 | Tula Russia Kosaya Gora iron works | IM5-1.8-12 | Hopper with dolomite and limestone of bin trestle of blasting furnace №1 (Blast-furnace shop) | 2010 | |
IM4-1.8-20 | The hopper with dolomite and limestone of bin trestle of blasting furnace № 1 (Blast-furnace shop) | 2011 | |||
74 | Ust'-Kamenogorsk Kazakhstan Ust-Kamenogorsk metallurgical complex | IM4-1.8-8 | Hoppers of charge (Charge curing workshop of lead plant) | 2009 | |
IM4-1.8-8 | Hoppers of charge (Charge curing workshop of lead plant) | 2009 | |||
75 | Cherepovets Russia Apatit | IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №1) | 2006 | |
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №2) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №3) | 2008 | |||
IM3-1.2-10 | Trans-shipping units of mineral fertilizers mixture and granulated blast furnace slag (Section of complex mineral fertilizers of line №4) | 2008 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.8-12 | Hoppers with loose additives (Dosing section of bulking additives of unit №2) | 2009 | |||
IM3-1.2-6 | 2 hoppers for off-grade product (Section №1) | 2010 | |||
IM3-1.8-4 | 2 hoppers with potassium chloride (Section №2) | 2010 | |||
IM3-1.5-5 | 2 hoppers (0,6m3 и 2,4m3) of aluminium fluoride trihydrate (Aluminum fluoride workshop) | 2013 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.70 (Workshop of mineral fertilizers production) | 2013 | |||
IM1-2.4-1 | Chute of drying and calcination unit (Aluminum fluoride workshop) | 2015 | |||
IM3-1.2-6 | 2 hoppers for brucite and 2 chutes (charging) in block 2.67 (Workshop of mineral fertilizers production) | 2016 | |||
IM3-1.9-8 | 2 hoppers with apatite concentrate, section №1, b.2.12, 2.15 (Workshop of extraction phosphoric acid -1) | 2017 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.8-12 | 3 hoppers of dosing unit (Building 2.70 Mineral fertilizers production) | 2019 | |||
IM3-1.5-6 | 4 hoppers of finished products of unloading unit (Mineral fertilizers warehouse) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.1-2 | Hoppers of finished product storage - granulated slag, potassium chloride, ammonia sulphate (Workshop of mineral fertilizers production) | 2019 | |||
IM3-1.5-4 | 2 fertilzer hoppers of housing 2.67 (Workshop of mineral fertilizers production) | 2021 | |||
76 | Cherepovets Russia Cherepovets iron and steel works | IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |
IM3-0.8-5 | 5 hoppers of dust collection of precipitator (Thermal heat and power station) | 2010 | |||
IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |||
IM3-0.8-5 | 5 hoppers of dust collection of electric precipitator (Thermal heat and power station) | 2010 | |||
IM3-1.2-4 | Hopper with dust of fired dolomite | 2012 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
IM3-1.5-4 | Hopper with dust of sintering production (Aspiration installation Д-7а) | 2013 | |||
77 | Charsk Kazakhstan Kazakhcement | IM4-1.8-24 | Hopper with clay and hopper with aleurolite (Workshop of raw materials preparation) | 2017 |